#TITLE_ALTERNATIVE#
P/Z method can be used to estimate volume of Initial Gas In Place (IGIP) accurately. This method requires production history data and reservoir pressure data. However, P/Z method using production history and reservoir pressure data is only valid for dry gas reservoir. In condensate gas reservoir, th...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30080 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |