#TITLE_ALTERNATIVE#

P/Z method can be used to estimate volume of Initial Gas In Place (IGIP) accurately. This method requires production history data and reservoir pressure data. However, P/Z method using production history and reservoir pressure data is only valid for dry gas reservoir. In condensate gas reservoir, th...

Full description

Saved in:
Bibliographic Details
Main Author: SYIFA WIDAYANTI (NIM : 12212093), RACHMI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30080
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia