DESIGN OF FOUNDATION TERMINAL BUS PURABAYA
<p align="justify">The design of the lower structure is an important aspect in the design of the building as a whole. The structure under the main waiting room of Purabaya Bus Terminal is designed using a group pole system. Design loads use a combination of Allowable Stress Design (A...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30127 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:30127 |
---|---|
spelling |
id-itb.:301272018-07-02T09:13:19ZDESIGN OF FOUNDATION TERMINAL BUS PURABAYA NANDA PERDANA - NIM : 15014077, RAHMADDIAN Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30127 <p align="justify">The design of the lower structure is an important aspect in the design of the building as a whole. The structure under the main waiting room of Purabaya Bus Terminal is designed using a group pole system. Design loads use a combination of Allowable Stress Design (ASD) loads to determine the dimensions of the mast and Load Resistance Factor Design (LRFD) load combinations to design pile reinforcement. <br /> <br /> <br /> Overall detail planning in this final project will include interpretation of soil data, checking for liquefaction potentials, piling poles, pile group settlements, checking pole demolitions, and pile reinforcement. The result of this final project is technical drawing in the form of group pillar and drawing of pillar. From the bottom structure results, it was found that the designated pile group has strong load-bearing (ASD) structures above it, but there are some notes especially on the potential of the soil to experience liquefaction so that prevention is necessary.<p align="justify"> <br /> text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
<p align="justify">The design of the lower structure is an important aspect in the design of the building as a whole. The structure under the main waiting room of Purabaya Bus Terminal is designed using a group pole system. Design loads use a combination of Allowable Stress Design (ASD) loads to determine the dimensions of the mast and Load Resistance Factor Design (LRFD) load combinations to design pile reinforcement. <br />
<br />
<br />
Overall detail planning in this final project will include interpretation of soil data, checking for liquefaction potentials, piling poles, pile group settlements, checking pole demolitions, and pile reinforcement. The result of this final project is technical drawing in the form of group pillar and drawing of pillar. From the bottom structure results, it was found that the designated pile group has strong load-bearing (ASD) structures above it, but there are some notes especially on the potential of the soil to experience liquefaction so that prevention is necessary.<p align="justify"> <br />
|
format |
Final Project |
author |
NANDA PERDANA - NIM : 15014077, RAHMADDIAN |
spellingShingle |
NANDA PERDANA - NIM : 15014077, RAHMADDIAN DESIGN OF FOUNDATION TERMINAL BUS PURABAYA |
author_facet |
NANDA PERDANA - NIM : 15014077, RAHMADDIAN |
author_sort |
NANDA PERDANA - NIM : 15014077, RAHMADDIAN |
title |
DESIGN OF FOUNDATION TERMINAL BUS PURABAYA |
title_short |
DESIGN OF FOUNDATION TERMINAL BUS PURABAYA |
title_full |
DESIGN OF FOUNDATION TERMINAL BUS PURABAYA |
title_fullStr |
DESIGN OF FOUNDATION TERMINAL BUS PURABAYA |
title_full_unstemmed |
DESIGN OF FOUNDATION TERMINAL BUS PURABAYA |
title_sort |
design of foundation terminal bus purabaya |
url |
https://digilib.itb.ac.id/gdl/view/30127 |
_version_ |
1821995645367484416 |