OPTIMIZATION OF RESERVOIR OPERATION FOR HYDROELECTRIC POWER PLANT WITH HISTORICAL DISCHARGE RELIABILITY CONSIDERATIONS (Case Study: Sadawarna Reservoir Plan in West Java Province)

<p align="justify">Hydroelectric power plants is a major additional function of water reservoir. In general the main function of reservoir are for irrigation and domestic raw water. In recent years, only large-capacity power plants have been built. But now renewable energy become mai...

Full description

Saved in:
Bibliographic Details
Main Author: PUTRI RACHMANTY - NIM : 95015304 , RATIH
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30242
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia