#TITLE_ALTERNATIVE#

Efficiency is one of the main criteria underlying company's performance assessment <br /> <br /> that is a measure of operational excellence or productivity. PT M in scheduling process <br /> <br /> has not consider the efficiency yet. And to achieve it can be done by se...

Full description

Saved in:
Bibliographic Details
Main Author: FRITRIANA NIM : 21816004, RIAN
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30406
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:30406
spelling id-itb.:304062018-07-02T09:19:43Z#TITLE_ALTERNATIVE# FRITRIANA NIM : 21816004, RIAN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30406 Efficiency is one of the main criteria underlying company's performance assessment <br /> <br /> that is a measure of operational excellence or productivity. PT M in scheduling process <br /> <br /> has not consider the efficiency yet. And to achieve it can be done by sequencing the <br /> <br /> production processes from the stages of weighing, granulation, mixing, compressing to <br /> <br /> inspection, so could got the sequence of products that provide most efficient (short) time <br /> <br /> for the completion time, machine idle time and the product idle time. The most efficient <br /> <br /> product sequence can be determined through scheduling method based on the SPT <br /> <br /> (Shortest Processing Time), LPT (Longest Processing Time) and random using standard <br /> <br /> hours data for each stage of production process. Scheduling method based on SPT is <br /> <br /> done in 6 schemes, LPT 6 schemes, random in 2 sequences with each sequence are 4 <br /> <br /> schemes and besides that 1 sequence using SPT method at the beginning of process <br /> <br /> stage and then sequence of product follow the previous step so that the total sequences <br /> <br /> are 21 schemes. The result of scheduling using SPT method that is started from <br /> <br /> weighing stage until mixing then continued with the same sequence until inspection <br /> <br /> stage gives the shortest (efficient) time for completion time and product iddle time. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Efficiency is one of the main criteria underlying company's performance assessment <br /> <br /> that is a measure of operational excellence or productivity. PT M in scheduling process <br /> <br /> has not consider the efficiency yet. And to achieve it can be done by sequencing the <br /> <br /> production processes from the stages of weighing, granulation, mixing, compressing to <br /> <br /> inspection, so could got the sequence of products that provide most efficient (short) time <br /> <br /> for the completion time, machine idle time and the product idle time. The most efficient <br /> <br /> product sequence can be determined through scheduling method based on the SPT <br /> <br /> (Shortest Processing Time), LPT (Longest Processing Time) and random using standard <br /> <br /> hours data for each stage of production process. Scheduling method based on SPT is <br /> <br /> done in 6 schemes, LPT 6 schemes, random in 2 sequences with each sequence are 4 <br /> <br /> schemes and besides that 1 sequence using SPT method at the beginning of process <br /> <br /> stage and then sequence of product follow the previous step so that the total sequences <br /> <br /> are 21 schemes. The result of scheduling using SPT method that is started from <br /> <br /> weighing stage until mixing then continued with the same sequence until inspection <br /> <br /> stage gives the shortest (efficient) time for completion time and product iddle time. <br />
format Theses
author FRITRIANA NIM : 21816004, RIAN
spellingShingle FRITRIANA NIM : 21816004, RIAN
#TITLE_ALTERNATIVE#
author_facet FRITRIANA NIM : 21816004, RIAN
author_sort FRITRIANA NIM : 21816004, RIAN
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/30406
_version_ 1822267439945089024