USULAN PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI LEAD TIME PRODUKSI PADA AREA SHEET PRESS FORMING DI PT DIRGANTARA INDONESIA

PT Dirgantara Indonesia is one of the State-Owned Enterprises (SOEs) engaged in the aircraft manufacturing industry. One of the main areas for fabricating is the sheet press forming area. The process carried out in this area includes cutting the plate, smoothing the surface of the plate, pressing, a...

Full description

Saved in:
Bibliographic Details
Main Author: HARRY MARTUA SIMAMORA NIM 13414080, RICARDO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30416
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:30416
spelling id-itb.:304162018-10-01T10:11:24ZUSULAN PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI LEAD TIME PRODUKSI PADA AREA SHEET PRESS FORMING DI PT DIRGANTARA INDONESIA HARRY MARTUA SIMAMORA NIM 13414080, RICARDO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/30416 PT Dirgantara Indonesia is one of the State-Owned Enterprises (SOEs) engaged in the aircraft manufacturing industry. One of the main areas for fabricating is the sheet press forming area. The process carried out in this area includes cutting the plate, smoothing the surface of the plate, pressing, and finish forming to improve the shape of the component. Based on the company's historical data, in the period January to September 2017, the company was unable to achieve the 96% of component target done in a timely manner. According to the management, the failure to achieve this target is due to high production lead time and waste in the production area of the sheet press forming area. Therefore, the lean manufacturing approach is being applied to identify and eliminate waste as to reduce production lead time. <br /> <br /> Lean manufacturing is made up of 3 main parts, namely making a map of the current state, analyzing the current state map, and designing a map of future conditions. In the current state mapping phase, mapping is done using value stream mapping (VSM). In addition, to detail activities on the production floor, entities and activities carried out are mapped using a cross-functional flowchart. In the current map making phase, 5whys analysis is used to identify waste. After knowing the root of the problem of waste, improvement was done to eliminate waste. The results of the improvement are then mapped into a map of future conditions. Finally, the conditions before and after the improvement is compared and analyzed. <br /> <br /> Based on VSM and cross-functional chart, the value added activity is only by 6,43% with lead time 3598,44 minutes. From the results of finding waste, found 3 main wastes that occur, namely waiting activities, over-processing, and unnecessary movements. To overcome the waste of waiting activities, load distribution is carried out to avoid imbalance of load between work stations which often causes waiting times between work stations. Overprocessing is minimized by training the operators to make them have uniform skills. To reduce unnecessary movements, standardization of work stations is carried out through the application of the 5S principle. From these improvements proposed, waste in the sheet press forming area can be minimized. The value added process is added to 13,27% with lead time 1743,98 minutes. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Dirgantara Indonesia is one of the State-Owned Enterprises (SOEs) engaged in the aircraft manufacturing industry. One of the main areas for fabricating is the sheet press forming area. The process carried out in this area includes cutting the plate, smoothing the surface of the plate, pressing, and finish forming to improve the shape of the component. Based on the company's historical data, in the period January to September 2017, the company was unable to achieve the 96% of component target done in a timely manner. According to the management, the failure to achieve this target is due to high production lead time and waste in the production area of the sheet press forming area. Therefore, the lean manufacturing approach is being applied to identify and eliminate waste as to reduce production lead time. <br /> <br /> Lean manufacturing is made up of 3 main parts, namely making a map of the current state, analyzing the current state map, and designing a map of future conditions. In the current state mapping phase, mapping is done using value stream mapping (VSM). In addition, to detail activities on the production floor, entities and activities carried out are mapped using a cross-functional flowchart. In the current map making phase, 5whys analysis is used to identify waste. After knowing the root of the problem of waste, improvement was done to eliminate waste. The results of the improvement are then mapped into a map of future conditions. Finally, the conditions before and after the improvement is compared and analyzed. <br /> <br /> Based on VSM and cross-functional chart, the value added activity is only by 6,43% with lead time 3598,44 minutes. From the results of finding waste, found 3 main wastes that occur, namely waiting activities, over-processing, and unnecessary movements. To overcome the waste of waiting activities, load distribution is carried out to avoid imbalance of load between work stations which often causes waiting times between work stations. Overprocessing is minimized by training the operators to make them have uniform skills. To reduce unnecessary movements, standardization of work stations is carried out through the application of the 5S principle. From these improvements proposed, waste in the sheet press forming area can be minimized. The value added process is added to 13,27% with lead time 1743,98 minutes.
format Final Project
author HARRY MARTUA SIMAMORA NIM 13414080, RICARDO
spellingShingle HARRY MARTUA SIMAMORA NIM 13414080, RICARDO
USULAN PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI LEAD TIME PRODUKSI PADA AREA SHEET PRESS FORMING DI PT DIRGANTARA INDONESIA
author_facet HARRY MARTUA SIMAMORA NIM 13414080, RICARDO
author_sort HARRY MARTUA SIMAMORA NIM 13414080, RICARDO
title USULAN PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI LEAD TIME PRODUKSI PADA AREA SHEET PRESS FORMING DI PT DIRGANTARA INDONESIA
title_short USULAN PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI LEAD TIME PRODUKSI PADA AREA SHEET PRESS FORMING DI PT DIRGANTARA INDONESIA
title_full USULAN PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI LEAD TIME PRODUKSI PADA AREA SHEET PRESS FORMING DI PT DIRGANTARA INDONESIA
title_fullStr USULAN PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI LEAD TIME PRODUKSI PADA AREA SHEET PRESS FORMING DI PT DIRGANTARA INDONESIA
title_full_unstemmed USULAN PENERAPAN LEAN MANUFACTURING UNTUK MENGURANGI LEAD TIME PRODUKSI PADA AREA SHEET PRESS FORMING DI PT DIRGANTARA INDONESIA
title_sort usulan penerapan lean manufacturing untuk mengurangi lead time produksi pada area sheet press forming di pt dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/30416
_version_ 1821995739769733120