REINFORCEMENT DESIGN OF RIVER SLOPE AND MORPHOLOGY ALONG WITH FLOOD WATER ANALYSIS FROM RAILWAY BRIDGE SECTION KAYU TANAM̉̉BATU TABAL̉̉PADANG PANJANG
On the railway line Section Batu Tabal-Padang Panjang–Kayu Tanam, there are 14 (fourteen) railway crossing bridges. From 1813 until 1925, this bridge was used for transportation of coal. However, in 2003, the transportation of coal passing through the bridge was stopped because of the depletion o...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/30488 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!