REINFORCEMENT DESIGN OF RIVER SLOPE AND MORPHOLOGY ALONG WITH FLOOD WATER ANALYSIS FROM RAILWAY BRIDGE SECTION KAYU TANAM–BATU TABAL–PADANG PANJANG

On the railway line Section Batu Tabal-Padang Panjang–Kayu Tanam, there are 14 (fourteen) railway crossing bridges. From 1813 until 1925, this bridge was used for transportation of coal. However, in 2003, the transportation of coal passing through the bridge was stopped because of the depletion o...

Full description

Saved in:
Bibliographic Details
Main Author: SIAGIAN , RIKARDY
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/30488
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first