CONSTRUCTION PLANNING METHOD OF PASSANGER TERMINAL AND AIRSIDE INFRASTRUCTURE OF MOPAH INTERNASIONAL AIRPORT

<p align="justify">Mopah International Airport is one of the facilities or transportation infrastructure, where the aircraft can take off and landed in the area of Merauke, Papua. Mopah International Airport is planned to be reconstructed in order to meet the increasing needs of pass...

Full description

Saved in:
Bibliographic Details
Main Author: NUUR FATINAH MEGASARI - NIM: 15014054, SITI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/31001
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:31001
spelling id-itb.:310012018-07-03T10:20:53ZCONSTRUCTION PLANNING METHOD OF PASSANGER TERMINAL AND AIRSIDE INFRASTRUCTURE OF MOPAH INTERNASIONAL AIRPORT NUUR FATINAH MEGASARI - NIM: 15014054, SITI Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/31001 <p align="justify">Mopah International Airport is one of the facilities or transportation infrastructure, where the aircraft can take off and landed in the area of Merauke, Papua. Mopah International Airport is planned to be reconstructed in order to meet the increasing needs of passengers. In the construction planning methods, the work under consideration is preparatory work, earthwork, passenger terminal work (lower and upper structure work), air pavement works (runway, taxiway and apron pavement), and drainage works. In implementation stage of a construction work, there are constraints to consider, such as fieldwork, time, resources and costs. Therefore, construction management is required covering construction implementation method, scheduling, and cost estimation. The conctruction planning method begins with determining the work breakdown structure, followed by calculating the volume of work based on the drawings and specifications, also calculating the productivity and duration of work, and finally estimate the cost of contruction and make S curve. The construction of Passanger Terminal And Airside Infrastructure Of Mopah Internasional Airport is estimated to take 630 days at total cost of Rp668.019.051.900,00. <p align="justify"> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify">Mopah International Airport is one of the facilities or transportation infrastructure, where the aircraft can take off and landed in the area of Merauke, Papua. Mopah International Airport is planned to be reconstructed in order to meet the increasing needs of passengers. In the construction planning methods, the work under consideration is preparatory work, earthwork, passenger terminal work (lower and upper structure work), air pavement works (runway, taxiway and apron pavement), and drainage works. In implementation stage of a construction work, there are constraints to consider, such as fieldwork, time, resources and costs. Therefore, construction management is required covering construction implementation method, scheduling, and cost estimation. The conctruction planning method begins with determining the work breakdown structure, followed by calculating the volume of work based on the drawings and specifications, also calculating the productivity and duration of work, and finally estimate the cost of contruction and make S curve. The construction of Passanger Terminal And Airside Infrastructure Of Mopah Internasional Airport is estimated to take 630 days at total cost of Rp668.019.051.900,00. <p align="justify">
format Final Project
author NUUR FATINAH MEGASARI - NIM: 15014054, SITI
spellingShingle NUUR FATINAH MEGASARI - NIM: 15014054, SITI
CONSTRUCTION PLANNING METHOD OF PASSANGER TERMINAL AND AIRSIDE INFRASTRUCTURE OF MOPAH INTERNASIONAL AIRPORT
author_facet NUUR FATINAH MEGASARI - NIM: 15014054, SITI
author_sort NUUR FATINAH MEGASARI - NIM: 15014054, SITI
title CONSTRUCTION PLANNING METHOD OF PASSANGER TERMINAL AND AIRSIDE INFRASTRUCTURE OF MOPAH INTERNASIONAL AIRPORT
title_short CONSTRUCTION PLANNING METHOD OF PASSANGER TERMINAL AND AIRSIDE INFRASTRUCTURE OF MOPAH INTERNASIONAL AIRPORT
title_full CONSTRUCTION PLANNING METHOD OF PASSANGER TERMINAL AND AIRSIDE INFRASTRUCTURE OF MOPAH INTERNASIONAL AIRPORT
title_fullStr CONSTRUCTION PLANNING METHOD OF PASSANGER TERMINAL AND AIRSIDE INFRASTRUCTURE OF MOPAH INTERNASIONAL AIRPORT
title_full_unstemmed CONSTRUCTION PLANNING METHOD OF PASSANGER TERMINAL AND AIRSIDE INFRASTRUCTURE OF MOPAH INTERNASIONAL AIRPORT
title_sort construction planning method of passanger terminal and airside infrastructure of mopah internasional airport
url https://digilib.itb.ac.id/gdl/view/31001
_version_ 1821995933737418752