PORE WATER PRESSURE RESPONSE OF BANDUNG CLAY UNDER TEST EMBANKMENT LOADING FOR PADALARANG - CILEUNYI TOLL HIGHWAY PROJECT
PORE WATER PRESSURE RESPONSE OF BANDUNG CLAY UNDER TEST EMBANKMENT LOADING FOR PADALARANG-CILEUNYI TOLL HIGHWAY PROJECT, Riyanto, Joko, 1988, Program Sistem dan Teknik Jalan Raya, Fakultas Pasca Sarjana, Institut Teknologi Bandung. A 30 m deep deposit of volcanic clay and sediments of related origi...
Saved in:
Main Author: | Setiawan, Agus |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/3107 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PORE WATER PRESSURE RESPONSE OF BANDUNG CLAY UNDER TEST EMBANKMENT LOADING FOR PADALARANG - CILEUNYI TOLL HIGHWAY PROJEC
by: Riyanto, Joko -
SETTLEMENT OF BANDUNG CLAY UNDER TRIAL EMBANKMENT LOADING FOR THE PADALARANG-CILEUNYI TOLL HIGHWAY
by: Hari Wilopo, Didik -
ASSESSMENT OF FIELD DENSITY TESTS AND COMPACTION CHARACTERISTICS OF SOIL ON PADALARANG - CILEUNYI TOLL ROAD PROJECT
by: Utoyo Moeno, Hadi -
PORE PRESSURE AND SETTLEMENT BEHAVIOUR OF SOFT CLAY OF INDONESIA AND MALAYSIA UNDER EMBANKMENT LOADING
by: Padmatanzil, Adyawati -
PORE PRESSURE & SETTLEMENT BEHAVIOUR OF SOFT CLAY OF INDONESIA AND MALAYSIA UNDER EMBANKMENT LOADING
by: Padmantazil, Adyawati