CONSTRUCTION METHOD DESIGN OF AL-MUZDAHIR MOSQUE OF CIBINONG LIPI SCIENCE CENTER
As an institution, LIPI has a large workforce and needs a place of worship that is convenient and easy to access. Therefore the Cibinong Al-Muzdahir Mosque Project was formed by integrating offices and places of worship. In addition to making it easier for workers to access their needs for worship,...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/31329 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:31329 |
---|---|
spelling |
id-itb.:313292018-09-24T17:10:15ZCONSTRUCTION METHOD DESIGN OF AL-MUZDAHIR MOSQUE OF CIBINONG LIPI SCIENCE CENTER CESARIO REINER HUTABARAT ( NIM : 15014076 ), TINOV Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/31329 As an institution, LIPI has a large workforce and needs a place of worship that is convenient and easy to access. Therefore the Cibinong Al-Muzdahir Mosque Project was formed by integrating offices and places of worship. In addition to making it easier for workers to access their needs for worship, the effectiveness of the work of every Muslim employee will increase because they do not need to waste much time and energy to get stuck if they have to find a mosque that is far away. <br /> <br /> Determination of the construction method begins with an analysis of the method aspects, namely, space, time, regulations, and costs. By knowing the existing environmental regulations and conditions, a method that can be used is chosen. The project starts by doing preparatory work, then proceed to the foundation construction with the pile method and installation of drainage by precast method. Next, work the upper structure with the in-situ cast method for the concrete components. Furthermore, the pavement work of the parking lot was done using flexible pavement method <br /> <br /> Based on the planning with the method, the zoning method is arranged for the project scheduling and a project completion plan is obtained on 10 July 2019. <br /> <br /> Cost estimation is carried out from the perspective of the consultant with the output in the form of an Engineer Estimate as a reference for the owner in the implementation and auction. The total cost required for the construction of this project is estimated at 11,255,000,000 rupiah (rounded). text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
As an institution, LIPI has a large workforce and needs a place of worship that is convenient and easy to access. Therefore the Cibinong Al-Muzdahir Mosque Project was formed by integrating offices and places of worship. In addition to making it easier for workers to access their needs for worship, the effectiveness of the work of every Muslim employee will increase because they do not need to waste much time and energy to get stuck if they have to find a mosque that is far away. <br />
<br />
Determination of the construction method begins with an analysis of the method aspects, namely, space, time, regulations, and costs. By knowing the existing environmental regulations and conditions, a method that can be used is chosen. The project starts by doing preparatory work, then proceed to the foundation construction with the pile method and installation of drainage by precast method. Next, work the upper structure with the in-situ cast method for the concrete components. Furthermore, the pavement work of the parking lot was done using flexible pavement method <br />
<br />
Based on the planning with the method, the zoning method is arranged for the project scheduling and a project completion plan is obtained on 10 July 2019. <br />
<br />
Cost estimation is carried out from the perspective of the consultant with the output in the form of an Engineer Estimate as a reference for the owner in the implementation and auction. The total cost required for the construction of this project is estimated at 11,255,000,000 rupiah (rounded). |
format |
Final Project |
author |
CESARIO REINER HUTABARAT ( NIM : 15014076 ), TINOV |
spellingShingle |
CESARIO REINER HUTABARAT ( NIM : 15014076 ), TINOV CONSTRUCTION METHOD DESIGN OF AL-MUZDAHIR MOSQUE OF CIBINONG LIPI SCIENCE CENTER |
author_facet |
CESARIO REINER HUTABARAT ( NIM : 15014076 ), TINOV |
author_sort |
CESARIO REINER HUTABARAT ( NIM : 15014076 ), TINOV |
title |
CONSTRUCTION METHOD DESIGN OF AL-MUZDAHIR MOSQUE OF CIBINONG LIPI SCIENCE CENTER |
title_short |
CONSTRUCTION METHOD DESIGN OF AL-MUZDAHIR MOSQUE OF CIBINONG LIPI SCIENCE CENTER |
title_full |
CONSTRUCTION METHOD DESIGN OF AL-MUZDAHIR MOSQUE OF CIBINONG LIPI SCIENCE CENTER |
title_fullStr |
CONSTRUCTION METHOD DESIGN OF AL-MUZDAHIR MOSQUE OF CIBINONG LIPI SCIENCE CENTER |
title_full_unstemmed |
CONSTRUCTION METHOD DESIGN OF AL-MUZDAHIR MOSQUE OF CIBINONG LIPI SCIENCE CENTER |
title_sort |
construction method design of al-muzdahir mosque of cibinong lipi science center |
url |
https://digilib.itb.ac.id/gdl/view/31329 |
_version_ |
1821996038925320192 |