UPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNITS OF CIBINONG 1 WTP IN PDAM TIRTA KAHURIPAN BOGOR DISTRICT

Water is very important for living creatures. Humans need clean water to meet their needs and survival. Water that can be utilized by humans should pay attention to the quality, quantity, and continuity so that required a water treatment and drinking water installation. Increasing the population of...

Full description

Saved in:
Bibliographic Details
Main Author: WIJAYA (NIM: 15314076), TYA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/31392
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:31392
spelling id-itb.:313922018-09-25T10:27:39ZUPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNITS OF CIBINONG 1 WTP IN PDAM TIRTA KAHURIPAN BOGOR DISTRICT WIJAYA (NIM: 15314076), TYA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/31392 Water is very important for living creatures. Humans need clean water to meet their needs and survival. Water that can be utilized by humans should pay attention to the quality, quantity, and continuity so that required a water treatment and drinking water installation. Increasing the population of Bogor Regency causes the need for clean water to be increased. This increase if not offset by the addition of clean water production then the fulfillment of clean water to the community will decline. One solution to this problem is the uprating of the water treatment plant which has the raw water source from the river. In planning uprating should be reviewed in advance of the factors behind the uprating of IPA 1 Cibinong. After that, an analysis of the mechanism of implementation of uprating filtration unit, disinfection and reservoir of IPA 1 Cibinong was conducted. This research was conducted by using primary data and secondary data which then analyzed and evaluated to produce design alternative. It is planned that the addition of capacity will be done on IPA 1 Cibinong to 600 L / s according to the calculation of study of water requirement. Based on the results of the evaluation of the quality of water production has met the quality standards, while the design criteria on the filtration unit has not met the design criteria so that the development of IPA 1 Cibinong more focused on the design parameters. The chosen alternative in IPA 1 Cibinong development planning is by adding units and design modifications. The selection is based on an increase in the percentage of services, land requirements, and costs for project development. Planning of IPA 1 Cibinong capacity increase to 600 L / s is done by adding 4 filters and changing the filter media specification to match the design criteria. Meanwhile, the disinfection and reservoir units need not be additional units because the existing condition is still sufficient. The cost required for uprating the filtration, disinfection and reservoir units is Rp. 2,110,000,000. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Water is very important for living creatures. Humans need clean water to meet their needs and survival. Water that can be utilized by humans should pay attention to the quality, quantity, and continuity so that required a water treatment and drinking water installation. Increasing the population of Bogor Regency causes the need for clean water to be increased. This increase if not offset by the addition of clean water production then the fulfillment of clean water to the community will decline. One solution to this problem is the uprating of the water treatment plant which has the raw water source from the river. In planning uprating should be reviewed in advance of the factors behind the uprating of IPA 1 Cibinong. After that, an analysis of the mechanism of implementation of uprating filtration unit, disinfection and reservoir of IPA 1 Cibinong was conducted. This research was conducted by using primary data and secondary data which then analyzed and evaluated to produce design alternative. It is planned that the addition of capacity will be done on IPA 1 Cibinong to 600 L / s according to the calculation of study of water requirement. Based on the results of the evaluation of the quality of water production has met the quality standards, while the design criteria on the filtration unit has not met the design criteria so that the development of IPA 1 Cibinong more focused on the design parameters. The chosen alternative in IPA 1 Cibinong development planning is by adding units and design modifications. The selection is based on an increase in the percentage of services, land requirements, and costs for project development. Planning of IPA 1 Cibinong capacity increase to 600 L / s is done by adding 4 filters and changing the filter media specification to match the design criteria. Meanwhile, the disinfection and reservoir units need not be additional units because the existing condition is still sufficient. The cost required for uprating the filtration, disinfection and reservoir units is Rp. 2,110,000,000.
format Final Project
author WIJAYA (NIM: 15314076), TYA
spellingShingle WIJAYA (NIM: 15314076), TYA
UPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNITS OF CIBINONG 1 WTP IN PDAM TIRTA KAHURIPAN BOGOR DISTRICT
author_facet WIJAYA (NIM: 15314076), TYA
author_sort WIJAYA (NIM: 15314076), TYA
title UPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNITS OF CIBINONG 1 WTP IN PDAM TIRTA KAHURIPAN BOGOR DISTRICT
title_short UPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNITS OF CIBINONG 1 WTP IN PDAM TIRTA KAHURIPAN BOGOR DISTRICT
title_full UPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNITS OF CIBINONG 1 WTP IN PDAM TIRTA KAHURIPAN BOGOR DISTRICT
title_fullStr UPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNITS OF CIBINONG 1 WTP IN PDAM TIRTA KAHURIPAN BOGOR DISTRICT
title_full_unstemmed UPRATING FILTRATION, DISINFECTION, AND RESERVOIR UNITS OF CIBINONG 1 WTP IN PDAM TIRTA KAHURIPAN BOGOR DISTRICT
title_sort uprating filtration, disinfection, and reservoir units of cibinong 1 wtp in pdam tirta kahuripan bogor district
url https://digilib.itb.ac.id/gdl/view/31392