PARKING LOT AND ROAD PAVEMENT DESIGN OF SENAYAN AQUATIC STADIUM IN SPECIAL REGION CAPITAL OF JAKARTA

<p align="justify">Senayan Aquatic Stadium is meant to be built in the needed of one among several venue of the 18th Asean Games, 2018. When designing the development of a certain particular area, both road and parking lot are very important aspect to be concerned about. Road itself...

Full description

Saved in:
Bibliographic Details
Main Author: RIZKI AULIYA - NIM : 15014133 , WACHID
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/31521
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:<p align="justify">Senayan Aquatic Stadium is meant to be built in the needed of one among several venue of the 18th Asean Games, 2018. When designing the development of a certain particular area, both road and parking lot are very important aspect to be concerned about. Road itself should be adequate to accommodate every movement within the area. While the parking lot, it should be able to accommodate the demand from every visitor who bring their own vehicle. <br /> <br /> Transportation aspect that being designed in this final project is about road design and parking lot design in the area of Senayan Aquatic Stadium. For road, the aspect that concerned about is the design of the structural pavement and for the parking lot, the aspect that concerned about is the design of the lot’s layout and the pavement itself. <br /> <br /> The designing process is started from gathering information that is related to parking demand and traffic load. After that the process of designing the parking lot and pavement structure are able to be started. For the parking lot itself, the designing process is according to demand, cost and space availability. While for the pavement road, the designing process is according to yearly traffic load. Kind of pavement that being used by the road is flexible pavement and for the parking lot, it is using rigid pavement.<p align="justify">