PLANING OF KARANGPILANG IV WATER TREATMENT PLANT ( WTP ) PDAM SURYA SEMBADA,SURABAYA CITY

According to Government Regulation No. 82 of 2001, water is one of nature's resources that has important functions for human life and to promote the common good. In the effort to increase the service up to 100% in drinking water based on Quantity, Quality, and Continuity, Local Water Company (P...

Full description

Saved in:
Bibliographic Details
Main Author: Maulany Fatimah, Wika
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/31598
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:31598
spelling id-itb.:315982018-09-27T11:52:00ZPLANING OF KARANGPILANG IV WATER TREATMENT PLANT ( WTP ) PDAM SURYA SEMBADA,SURABAYA CITY Maulany Fatimah, Wika Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/31598 According to Government Regulation No. 82 of 2001, water is one of nature's resources that has important functions for human life and to promote the common good. In the effort to increase the service up to 100% in drinking water based on Quantity, Quality, and Continuity, Local Water Company (PDAM) Surya Sembada will build one additional WTP in Karangpilang, namely Karangpilang WTP IV with capacity of around 2000 Liter Per Second (LPS). Using the projected population of the Arithmetic method and the calculation of water requirements, it is found that in the next 20 years, Surabaya must meet the water requirement of 2795 LPS, even after being supplied with water supply of 1000 LPS from Umbulan Springs project. Therefore, the development of WTP with 2000 LPS capacity can be justified. Compared to Peraturan Menteri Kesehatan (Permenkes) 492 of 2010, the parameters in raw water from Mas River which is used that must be removed are turbidity, Suspended Solid (SS), Dissolved Oxygen (DO), Nitrite, Chemical Oxygen Demand (COD), Biochemical Oxygen Demand (BOD), Organic Substance (KMnO4), faecal coli, and total coli. The selection of alternative unit sequences was performed using a technology selection matrix from Babbitt in 1967. Using Simple Additive Weighting (SAW) method, it was found that the alternatives of selected units for processing were aeration, pre-sedimentation, coagulation, hydraulic flocculation, high rate settling using a tube settler, and a quick sand filter. In addition, a reservoir unit is also made to accommodate the production water before being distributed. <br /> <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description According to Government Regulation No. 82 of 2001, water is one of nature's resources that has important functions for human life and to promote the common good. In the effort to increase the service up to 100% in drinking water based on Quantity, Quality, and Continuity, Local Water Company (PDAM) Surya Sembada will build one additional WTP in Karangpilang, namely Karangpilang WTP IV with capacity of around 2000 Liter Per Second (LPS). Using the projected population of the Arithmetic method and the calculation of water requirements, it is found that in the next 20 years, Surabaya must meet the water requirement of 2795 LPS, even after being supplied with water supply of 1000 LPS from Umbulan Springs project. Therefore, the development of WTP with 2000 LPS capacity can be justified. Compared to Peraturan Menteri Kesehatan (Permenkes) 492 of 2010, the parameters in raw water from Mas River which is used that must be removed are turbidity, Suspended Solid (SS), Dissolved Oxygen (DO), Nitrite, Chemical Oxygen Demand (COD), Biochemical Oxygen Demand (BOD), Organic Substance (KMnO4), faecal coli, and total coli. The selection of alternative unit sequences was performed using a technology selection matrix from Babbitt in 1967. Using Simple Additive Weighting (SAW) method, it was found that the alternatives of selected units for processing were aeration, pre-sedimentation, coagulation, hydraulic flocculation, high rate settling using a tube settler, and a quick sand filter. In addition, a reservoir unit is also made to accommodate the production water before being distributed. <br /> <br />
format Final Project
author Maulany Fatimah, Wika
spellingShingle Maulany Fatimah, Wika
PLANING OF KARANGPILANG IV WATER TREATMENT PLANT ( WTP ) PDAM SURYA SEMBADA,SURABAYA CITY
author_facet Maulany Fatimah, Wika
author_sort Maulany Fatimah, Wika
title PLANING OF KARANGPILANG IV WATER TREATMENT PLANT ( WTP ) PDAM SURYA SEMBADA,SURABAYA CITY
title_short PLANING OF KARANGPILANG IV WATER TREATMENT PLANT ( WTP ) PDAM SURYA SEMBADA,SURABAYA CITY
title_full PLANING OF KARANGPILANG IV WATER TREATMENT PLANT ( WTP ) PDAM SURYA SEMBADA,SURABAYA CITY
title_fullStr PLANING OF KARANGPILANG IV WATER TREATMENT PLANT ( WTP ) PDAM SURYA SEMBADA,SURABAYA CITY
title_full_unstemmed PLANING OF KARANGPILANG IV WATER TREATMENT PLANT ( WTP ) PDAM SURYA SEMBADA,SURABAYA CITY
title_sort planing of karangpilang iv water treatment plant ( wtp ) pdam surya sembada,surabaya city
url https://digilib.itb.ac.id/gdl/view/31598
_version_ 1821996122620559360