COST ESTIMATION OF ROAD MAINTENANCE IN WEST JAVA PROVINCE
In the provincial road maintenance project cycle, there are several methods of cost estimation, closely related to specific project stage. Even at its earliest stage, the project owner obviously needs a cost estimation for budgeting purpose. Hence, an applicable, accurate, and transparant cost es...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/32128 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | In the provincial road maintenance project cycle, there are several methods of cost
estimation, closely related to specific project stage. Even at its earliest stage, the
project owner obviously needs a cost estimation for budgeting purpose. Hence, an
applicable, accurate, and transparant cost estimation is a necessity.
This research is aimed to generate a cost estimation procedure, using High and
Low and Least-Square method, to get an accurate road maintenance cost
estimation, that will be later compared to actual data of reviewed road rehabilition
package. Data was taken from BPJ’s 37 road rehabilitation work package of
Service Region III, Bina Marga Office, Bandung, West Java province during 2010
to 2014.
It is found that Least-Square method is superior over comparing High and Low
Method. Least-Square method produced is expressed as Y = 641.993.730,98 +
841.704.828,23 X, with minimum, maximum, and average accuracy of -13,049%,
55,192%, 6.250% respectively. These results indicate better performance as
compared to the accuracy of the estimation of the cost of using the method of
High and Low having in a range between 0.003% up to 64,903%, with average of
6.250%. The results of the cost estimation using Least-Square method can be used
as a budgeting tool on road rehabilitation project in West Java Province. |
---|