Stakeholder Analysis and Network Analysis on Debottlenecking Process of Mass Rapid Transport (MRT) Jakarta Route Construction in Lebak Bulus, Bunderan HI with Gas Pipeline
Infrastructure construction is one of the crucial aspect and have an important role in the in national development. Despite it’s significance, sometimes in the context of planning and implementation occurs some problems and obstacles. The problems that usually occurs mostly caused by...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/32995 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:32995 |
---|---|
spelling |
id-itb.:329952019-01-09T15:10:19ZStakeholder Analysis and Network Analysis on Debottlenecking Process of Mass Rapid Transport (MRT) Jakarta Route Construction in Lebak Bulus, Bunderan HI with Gas Pipeline Daniel Transportasi ; transportasi darat Indonesia Final Project debottlenecking, Jakarta Mass Rapid Transit, stakeholder analysis, and social network analysis INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/32995 Infrastructure construction is one of the crucial aspect and have an important role in the in national development. Despite it’s significance, sometimes in the context of planning and implementation occurs some problems and obstacles. The problems that usually occurs mostly caused by differents perspective and sectoral ego between the stakeholders that will hamper the decision making process. One of the Indonesia National Strategic Project or so called ‘Proyek Strategis Nasional’ and have national attention is construction of Jakarta Mass Rapid Transit. The implementation of this project faces some challenges and obstacels, on of it is the case of land acquisition that having some conflict with another utility network. The conflict happen in Construction Package-101 and Construction Package-102 that happens to cross a gas pipe line along in Lebak Bulus to Bundaran HI MRT Corridor. In this research, in-depth semi-structured interview is done to gather relevant information in the context of process and decision making of the so called conflict debottlenecking in the case of Mass Rapid Transit Jakarta conflict with the Ministry of Energy and Mineral Resources that happen to be the owner of the gas pipeline. The process of analysis in this research is doing the codification of information based on research criterias that have been formulated, then the information about the process of debottlenecking, the communication or interaction between stakeholders, and the information about stakeholders interest and influence will be structured. After that, the stakeholder analysis using network model theory can be done with the information about the stakeholder attribute and interaction. Using the social network analysis, the network that formed in the process of debottlenecking will be described with the centrality measures of degree centrality and betweenness centrality. Defining the main problem in the case is one of the most significant thing to do in order to take care of the conflicts that happen and the role of third-party institution will make the process and interaction in the negotiation and decision making process feasible. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Transportasi ; transportasi darat |
spellingShingle |
Transportasi ; transportasi darat Daniel Stakeholder Analysis and Network Analysis on Debottlenecking Process of Mass Rapid Transport (MRT) Jakarta Route Construction in Lebak Bulus, Bunderan HI with Gas Pipeline |
description |
Infrastructure construction is one of the crucial aspect and have an important role in the
in national development. Despite it’s significance, sometimes in the context of planning
and implementation occurs some problems and obstacles. The problems that usually
occurs mostly caused by differents perspective and sectoral ego between the stakeholders
that will hamper the decision making process. One of the Indonesia National Strategic
Project or so called ‘Proyek Strategis Nasional’ and have national attention is
construction of Jakarta Mass Rapid Transit. The implementation of this project faces
some challenges and obstacels, on of it is the case of land acquisition that having some
conflict with another utility network. The conflict happen in Construction Package-101
and Construction Package-102 that happens to cross a gas pipe line along in Lebak Bulus
to Bundaran HI MRT Corridor. In this research, in-depth semi-structured interview is
done to gather relevant information in the context of process and decision making of the
so called conflict debottlenecking in the case of Mass Rapid Transit Jakarta conflict with
the Ministry of Energy and Mineral Resources that happen to be the owner of the gas
pipeline. The process of analysis in this research is doing the codification of information
based on research criterias that have been formulated, then the information about the
process of debottlenecking, the communication or interaction between stakeholders, and
the information about stakeholders interest and influence will be structured. After that,
the stakeholder analysis using network model theory can be done with the information
about the stakeholder attribute and interaction. Using the social network analysis, the
network that formed in the process of debottlenecking will be described with the centrality
measures of degree centrality and betweenness centrality. Defining the main problem in
the case is one of the most significant thing to do in order to take care of the conflicts that
happen and the role of third-party institution will make the process and interaction in the
negotiation and decision making process feasible. |
format |
Final Project |
author |
Daniel |
author_facet |
Daniel |
author_sort |
Daniel |
title |
Stakeholder Analysis and Network Analysis on Debottlenecking Process of Mass Rapid Transport (MRT) Jakarta Route Construction in Lebak Bulus, Bunderan HI with Gas Pipeline |
title_short |
Stakeholder Analysis and Network Analysis on Debottlenecking Process of Mass Rapid Transport (MRT) Jakarta Route Construction in Lebak Bulus, Bunderan HI with Gas Pipeline |
title_full |
Stakeholder Analysis and Network Analysis on Debottlenecking Process of Mass Rapid Transport (MRT) Jakarta Route Construction in Lebak Bulus, Bunderan HI with Gas Pipeline |
title_fullStr |
Stakeholder Analysis and Network Analysis on Debottlenecking Process of Mass Rapid Transport (MRT) Jakarta Route Construction in Lebak Bulus, Bunderan HI with Gas Pipeline |
title_full_unstemmed |
Stakeholder Analysis and Network Analysis on Debottlenecking Process of Mass Rapid Transport (MRT) Jakarta Route Construction in Lebak Bulus, Bunderan HI with Gas Pipeline |
title_sort |
stakeholder analysis and network analysis on debottlenecking process of mass rapid transport (mrt) jakarta route construction in lebak bulus, bunderan hi with gas pipeline |
url |
https://digilib.itb.ac.id/gdl/view/32995 |
_version_ |
1822268081767972864 |