PERENCANAAN DESAIN PENAMBAHAN KAPASITAS PENGOLAHAN AIR MINUM DI PT KRAKATAU TIRTA INDUSTRI
PT. Krakatau Tirta Industri is a supporting unit of PT Krakatau Steel (Persero) in the provision of clean water. Most of the water produced is used for industrial purpose and the other for the needs of the city of Cilegon. Demand water level in Krakatau Steel Industrial area is getting up. especi...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/33892 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:33892 |
---|---|
spelling |
id-itb.:338922019-01-31T08:25:39ZPERENCANAAN DESAIN PENAMBAHAN KAPASITAS PENGOLAHAN AIR MINUM DI PT KRAKATAU TIRTA INDUSTRI Ilmi, Ulil Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project additional capacity, coagulation, filtration, flocculation, sedimentation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/33892 PT. Krakatau Tirta Industri is a supporting unit of PT Krakatau Steel (Persero) in the provision of clean water. Most of the water produced is used for industrial purpose and the other for the needs of the city of Cilegon. Demand water level in Krakatau Steel Industrial area is getting up. especially with the addition of Posco factory resulting in the processing load at the Krenceng Water Treatment Plant become heavier. Although the initial design discharge processing was 2,000 liters / second, but until now the maximum discharge successfully operated is 1,600 liters / second, And even then only to meet the needs at any given moment so never carried out a systematic and planned. Another issue is when the discharge of 7,000 m3 / hour, overflow occurs in the distribution chamber so that the discharge may be processed just under 7,000 m3 / h. A further problem is at the time of discharge of 5,000 m3 / hin the filtration unit is full so often happens automatic backwash. To overcome the problems that occur, it is planned to increase the capacity of water treatment to create a new installation unit which has a capacity of 700 liters / sec. Based on the secondary data processing units is planned to be built. The units are coagulation using hydraulic jump, flocculation hydraulic or Baffled channel, rectangular sedimentation tanks with tube settler, and rapid sand filtration using a dual media filter. With the new water treatment plant, PT. Krakatau Tirta Industri will be able to improve their services to consumers. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan |
spellingShingle |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan Ilmi, Ulil PERENCANAAN DESAIN PENAMBAHAN KAPASITAS PENGOLAHAN AIR MINUM DI PT KRAKATAU TIRTA INDUSTRI |
description |
PT. Krakatau Tirta Industri is a supporting unit of PT Krakatau Steel (Persero) in the
provision of clean water. Most of the water produced is used for industrial purpose
and the other for the needs of the city of Cilegon. Demand water level in Krakatau
Steel Industrial area is getting up. especially with the addition of Posco factory
resulting in the processing load at the Krenceng Water Treatment Plant become
heavier. Although the initial design discharge processing was 2,000 liters / second,
but until now the maximum discharge successfully operated is 1,600 liters / second,
And even then only to meet the needs at any given moment so never carried out a
systematic and planned. Another issue is when the discharge of 7,000 m3 / hour,
overflow occurs in the distribution chamber so that the discharge may be processed
just under 7,000 m3 / h. A further problem is at the time of discharge of 5,000 m3 / hin
the filtration unit is full so often happens automatic backwash. To overcome the
problems that occur, it is planned to increase the capacity of water treatment to create
a new installation unit which has a capacity of 700 liters / sec. Based on the secondary
data processing units is planned to be built. The units are coagulation using hydraulic
jump, flocculation hydraulic or Baffled channel, rectangular sedimentation tanks with
tube settler, and rapid sand filtration using a dual media filter. With the new water
treatment plant, PT. Krakatau Tirta Industri will be able to improve their services to consumers. |
format |
Final Project |
author |
Ilmi, Ulil |
author_facet |
Ilmi, Ulil |
author_sort |
Ilmi, Ulil |
title |
PERENCANAAN DESAIN PENAMBAHAN KAPASITAS PENGOLAHAN AIR MINUM DI PT KRAKATAU TIRTA INDUSTRI |
title_short |
PERENCANAAN DESAIN PENAMBAHAN KAPASITAS PENGOLAHAN AIR MINUM DI PT KRAKATAU TIRTA INDUSTRI |
title_full |
PERENCANAAN DESAIN PENAMBAHAN KAPASITAS PENGOLAHAN AIR MINUM DI PT KRAKATAU TIRTA INDUSTRI |
title_fullStr |
PERENCANAAN DESAIN PENAMBAHAN KAPASITAS PENGOLAHAN AIR MINUM DI PT KRAKATAU TIRTA INDUSTRI |
title_full_unstemmed |
PERENCANAAN DESAIN PENAMBAHAN KAPASITAS PENGOLAHAN AIR MINUM DI PT KRAKATAU TIRTA INDUSTRI |
title_sort |
perencanaan desain penambahan kapasitas pengolahan air minum di pt krakatau tirta industri |
url |
https://digilib.itb.ac.id/gdl/view/33892 |
_version_ |
1822924118165553152 |