EVALUASI DAN PERENCANAAN INSTALASI PENGOLAHAN AIR BERSIH RS MATA CICENDO BANDUNG
At the moment, the sources for Cicendo Eye Hospital water supply system are taken from Bandung PDAM and two artesian well. Ideally, the water taken from PDAM is the main source but due to the limited amount supllied, two artesian well was made. The wells are now the main water supply for the hosp...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/35017 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:35017 |
---|---|
spelling |
id-itb.:350172019-02-19T10:15:11ZEVALUASI DAN PERENCANAAN INSTALASI PENGOLAHAN AIR BERSIH RS MATA CICENDO BANDUNG CARLETTASARI K P, MONICA Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project artessian well, iron, manganese, multiple tray INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/35017 At the moment, the sources for Cicendo Eye Hospital water supply system are taken from Bandung PDAM and two artesian well. Ideally, the water taken from PDAM is the main source but due to the limited amount supllied, two artesian well was made. The wells are now the main water supply for the hospital. The problem with water from wells are the high level of iron and manganese contained. The existing treatment units are sand filtration also resin and pressure filter. However, the units do not function well and desinfection is not carried out so the microbiologcical quality is not well guaranteed. To overcame the presence of manganese and iron, a Multiply Tray Aerator is used. The design maximalizing the contact between air and water the iron and manganese can be aside. This treatmen is used considering the feasibility and its simple operations. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik (Rekayasa, enjinering dan kegiatan berkaitan) |
spellingShingle |
Teknik (Rekayasa, enjinering dan kegiatan berkaitan) CARLETTASARI K P, MONICA EVALUASI DAN PERENCANAAN INSTALASI PENGOLAHAN AIR BERSIH RS MATA CICENDO BANDUNG |
description |
At the moment, the sources for Cicendo Eye Hospital water supply system are taken from Bandung
PDAM and two artesian well. Ideally, the water taken from PDAM is the main source but due to
the limited amount supllied, two artesian well was made. The wells are now the main water supply
for the hospital. The problem with water from wells are the high level of iron and manganese
contained. The existing treatment units are sand filtration also resin and pressure filter. However,
the units do not function well and desinfection is not carried out so the microbiologcical quality is
not well guaranteed. To overcame the presence of manganese and iron, a Multiply Tray Aerator is
used. The design maximalizing the contact between air and water the iron and manganese can be
aside. This treatmen is used considering the feasibility and its simple operations. |
format |
Final Project |
author |
CARLETTASARI K P, MONICA |
author_facet |
CARLETTASARI K P, MONICA |
author_sort |
CARLETTASARI K P, MONICA |
title |
EVALUASI DAN PERENCANAAN INSTALASI PENGOLAHAN AIR BERSIH RS MATA CICENDO BANDUNG |
title_short |
EVALUASI DAN PERENCANAAN INSTALASI PENGOLAHAN AIR BERSIH RS MATA CICENDO BANDUNG |
title_full |
EVALUASI DAN PERENCANAAN INSTALASI PENGOLAHAN AIR BERSIH RS MATA CICENDO BANDUNG |
title_fullStr |
EVALUASI DAN PERENCANAAN INSTALASI PENGOLAHAN AIR BERSIH RS MATA CICENDO BANDUNG |
title_full_unstemmed |
EVALUASI DAN PERENCANAAN INSTALASI PENGOLAHAN AIR BERSIH RS MATA CICENDO BANDUNG |
title_sort |
evaluasi dan perencanaan instalasi pengolahan air bersih rs mata cicendo bandung |
url |
https://digilib.itb.ac.id/gdl/view/35017 |
_version_ |
1822924345641533440 |