CONSTRUCTION COST ESTIMATE OF BUILDING PROJECT CENTER FOR ADVANCED SCIENCES (CAS) ITB

Cost and time are the important factors of project construction management aspect. Contractors always try to minimize the expenses cost to get the maximum profit. To achieve this, process of cost estimating is needed to estimate the amount of money that needed to accomplish the construction project....

Full description

Saved in:
Bibliographic Details
Main Author: Andriyani Teguh, Novi
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/35336
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:35336
spelling id-itb.:353362019-02-25T10:58:33ZCONSTRUCTION COST ESTIMATE OF BUILDING PROJECT CENTER FOR ADVANCED SCIENCES (CAS) ITB Andriyani Teguh, Novi Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project estimate, direct cost, indirect cost, resource enumeration method, unit cost, bidding price. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/35336 Cost and time are the important factors of project construction management aspect. Contractors always try to minimize the expenses cost to get the maximum profit. To achieve this, process of cost estimating is needed to estimate the amount of money that needed to accomplish the construction project. Besides that, the cost estimating process can be used as reference to determine the bidding price. The estimated cost divided into two characters, direct cost and indirect cost. Direct cost is cost that has direct relation with the amount of activity/work in the project. Direct cost contain cost of resources that are expended solely to complete the activity/work of the project, such as material cost, equipment cost, and labor cost. Indirect cost is cost that has indirect relation with the amount of activity/work in the project. Indirect cost contain cost of resources that need to be expended to support the activity/work of the project, such as overhead cost, general conditions, contingencies, profit, and taxes. The used method of cost estimating in this project is resource enumeration method. The reason of choosing this method is to cause a relationship between duration of work and amount of labors/workers in calculating the cost of work. After the cost of work is known, the unit cost of work can be known too. The unit cost of work is an important factor in determining the bid price. After all the direct cost are counted, the indirect cost can be estimated. The amount of indirect cost is stated with percentage of direct cost. The final results for construction cost estimate of project building Center for Advanced Sciences (CAS) ITB, structural works only, is 57,5 billion rupiahs (include taxes). text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Andriyani Teguh, Novi
CONSTRUCTION COST ESTIMATE OF BUILDING PROJECT CENTER FOR ADVANCED SCIENCES (CAS) ITB
description Cost and time are the important factors of project construction management aspect. Contractors always try to minimize the expenses cost to get the maximum profit. To achieve this, process of cost estimating is needed to estimate the amount of money that needed to accomplish the construction project. Besides that, the cost estimating process can be used as reference to determine the bidding price. The estimated cost divided into two characters, direct cost and indirect cost. Direct cost is cost that has direct relation with the amount of activity/work in the project. Direct cost contain cost of resources that are expended solely to complete the activity/work of the project, such as material cost, equipment cost, and labor cost. Indirect cost is cost that has indirect relation with the amount of activity/work in the project. Indirect cost contain cost of resources that need to be expended to support the activity/work of the project, such as overhead cost, general conditions, contingencies, profit, and taxes. The used method of cost estimating in this project is resource enumeration method. The reason of choosing this method is to cause a relationship between duration of work and amount of labors/workers in calculating the cost of work. After the cost of work is known, the unit cost of work can be known too. The unit cost of work is an important factor in determining the bid price. After all the direct cost are counted, the indirect cost can be estimated. The amount of indirect cost is stated with percentage of direct cost. The final results for construction cost estimate of project building Center for Advanced Sciences (CAS) ITB, structural works only, is 57,5 billion rupiahs (include taxes).
format Final Project
author Andriyani Teguh, Novi
author_facet Andriyani Teguh, Novi
author_sort Andriyani Teguh, Novi
title CONSTRUCTION COST ESTIMATE OF BUILDING PROJECT CENTER FOR ADVANCED SCIENCES (CAS) ITB
title_short CONSTRUCTION COST ESTIMATE OF BUILDING PROJECT CENTER FOR ADVANCED SCIENCES (CAS) ITB
title_full CONSTRUCTION COST ESTIMATE OF BUILDING PROJECT CENTER FOR ADVANCED SCIENCES (CAS) ITB
title_fullStr CONSTRUCTION COST ESTIMATE OF BUILDING PROJECT CENTER FOR ADVANCED SCIENCES (CAS) ITB
title_full_unstemmed CONSTRUCTION COST ESTIMATE OF BUILDING PROJECT CENTER FOR ADVANCED SCIENCES (CAS) ITB
title_sort construction cost estimate of building project center for advanced sciences (cas) itb
url https://digilib.itb.ac.id/gdl/view/35336
_version_ 1822924403338379264