PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT MARINIR CILANDAK

Wastewater originating from hospitals consists of domestic wastewater and infectious wastewater. The wastewater characteristics that may contain high amount of organics potentially contain pathogenic bacteria makes hospital wastewater needs to undergo treatment process before discharged into water b...

Full description

Saved in:
Bibliographic Details
Main Author: Zaitoon, Armafitriani
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/35546
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:35546
spelling id-itb.:355462019-02-27T10:49:07ZPERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT MARINIR CILANDAK Zaitoon, Armafitriani Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project BOD, CMAS, Hospital, Wastewater, WWTP INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/35546 Wastewater originating from hospitals consists of domestic wastewater and infectious wastewater. The wastewater characteristics that may contain high amount of organics potentially contain pathogenic bacteria makes hospital wastewater needs to undergo treatment process before discharged into water body. According to Decree of Health Minister of Indonesia Number 1204/MENKES/SK/X/2004, hospitals are required to have Wastewater Treatment Plant (WWTP). Based on quality test result, wastewater from Marinir Cilandak Hospital exceeds the quality standards on BOD, COD, TSS, and ammonia. The quality standard in reference is Decree of Environmental Minister of Indonesia Number kep-58/MENLH/12/1995. According to the projection results of bed number and employee number, generated wastewater on 2023 is estimated to be 105,062 m3/day. Planned type of treatment consists of physical treatment with bar screen and sedimentation tank, biological treatment, chemical treatment by disinfection, also sludge treatment with sludge drying bed. Proposed biological treatment alternatives are Completely Mixed Activated Sludge (CMAS) and Rotating Biological Contactor (RBC). Selection considerations are based on technical aspect, economical aspect, and operational aspect done by scale weighting. Technical aspect appraisal is based on BOD removal efficiency. Economical aspect appraisal is based on the result of Present Value Annual Cost analysis. Meanwhile operational aspect is based on land requirement, operational level of difficulty, and energy consumption. From the two alternatives, Completely Mixed Activated Sludge is chosen for treating wastewater in Marinir Cilandak Hospital. The total cost needed for this wastewater treatment plant project is 1.238.674.369,00 Rupiahs. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik saniter dan perkotaan; teknik perlindungan lingkungan
spellingShingle Teknik saniter dan perkotaan; teknik perlindungan lingkungan
Zaitoon, Armafitriani
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT MARINIR CILANDAK
description Wastewater originating from hospitals consists of domestic wastewater and infectious wastewater. The wastewater characteristics that may contain high amount of organics potentially contain pathogenic bacteria makes hospital wastewater needs to undergo treatment process before discharged into water body. According to Decree of Health Minister of Indonesia Number 1204/MENKES/SK/X/2004, hospitals are required to have Wastewater Treatment Plant (WWTP). Based on quality test result, wastewater from Marinir Cilandak Hospital exceeds the quality standards on BOD, COD, TSS, and ammonia. The quality standard in reference is Decree of Environmental Minister of Indonesia Number kep-58/MENLH/12/1995. According to the projection results of bed number and employee number, generated wastewater on 2023 is estimated to be 105,062 m3/day. Planned type of treatment consists of physical treatment with bar screen and sedimentation tank, biological treatment, chemical treatment by disinfection, also sludge treatment with sludge drying bed. Proposed biological treatment alternatives are Completely Mixed Activated Sludge (CMAS) and Rotating Biological Contactor (RBC). Selection considerations are based on technical aspect, economical aspect, and operational aspect done by scale weighting. Technical aspect appraisal is based on BOD removal efficiency. Economical aspect appraisal is based on the result of Present Value Annual Cost analysis. Meanwhile operational aspect is based on land requirement, operational level of difficulty, and energy consumption. From the two alternatives, Completely Mixed Activated Sludge is chosen for treating wastewater in Marinir Cilandak Hospital. The total cost needed for this wastewater treatment plant project is 1.238.674.369,00 Rupiahs.
format Final Project
author Zaitoon, Armafitriani
author_facet Zaitoon, Armafitriani
author_sort Zaitoon, Armafitriani
title PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT MARINIR CILANDAK
title_short PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT MARINIR CILANDAK
title_full PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT MARINIR CILANDAK
title_fullStr PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT MARINIR CILANDAK
title_full_unstemmed PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH SAKIT MARINIR CILANDAK
title_sort perencanaan instalasi pengolahan air limbah rumah sakit marinir cilandak
url https://digilib.itb.ac.id/gdl/view/35546
_version_ 1822924446388715520