PERENCANAAN SISTEM JARINGAN DISTRIBUSI AIRMINUM DI KOMPLEK ARCAMANIK ENDAH BANDUNG DAN SEKITARNYA DENGAN SUMBER LEBIH DARI SATU (MULTI SOURCES)
Arcamanik Endah Housing Complex is one of the residential complex that located in the eastern part of Bandung City. This residential complex is located in Arcamanik District, Bandung. Based on Bandung City’s RTRW year 2011-2031, Arcamanik District is directed to has a function as housing or resid...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/35549 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:35549 |
---|---|
spelling |
id-itb.:355492019-02-27T11:04:16ZPERENCANAAN SISTEM JARINGAN DISTRIBUSI AIRMINUM DI KOMPLEK ARCAMANIK ENDAH BANDUNG DAN SEKITARNYA DENGAN SUMBER LEBIH DARI SATU (MULTI SOURCES) Ari Ruwaedi, Muhammad Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project distribution, drilled well, pipeline, water supply INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/35549 Arcamanik Endah Housing Complex is one of the residential complex that located in the eastern part of Bandung City. This residential complex is located in Arcamanik District, Bandung. Based on Bandung City’s RTRW year 2011-2031, Arcamanik District is directed to has a function as housing or residental area. This residential complex needs some development and construction both in terms of human sources, administrative facilities and urban infrastructure. One of the infrastructure that is necessary to developed in this residential complex is Water Supply System (SPAM). Water sources for drinking water distribution system in Arcamanik Housing Complex currently using 4 drilled wells, but there only 3 drilled wells that can be used.All of the drill wells that still works is managed by PDAM Tirtawening Kota Bandung. The water from these drilled wells will be directed to water reservoir. Planning step is expected to fulfil the water needs for all of citizen in Arcamanik endak Complex by maximaze the drill well of PDAM Tirtawening. On the planning stage will be made some alternative distribution systems using 3 reservoir that the water sources are from the drilled wells. Planning is done with three alternatives of drinking water distribution network system which will be selected the best alternative taking into account the technical criteria for hydraulic, length of pipe and reservoir which is used, as well as economically viable. Planning is expected to meet drinking water needs in the area planning both in terms quantity and continuity. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan |
spellingShingle |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan Ari Ruwaedi, Muhammad PERENCANAAN SISTEM JARINGAN DISTRIBUSI AIRMINUM DI KOMPLEK ARCAMANIK ENDAH BANDUNG DAN SEKITARNYA DENGAN SUMBER LEBIH DARI SATU (MULTI SOURCES) |
description |
Arcamanik Endah Housing Complex is one of the residential complex that located
in the eastern part of Bandung City. This residential complex is located in
Arcamanik District, Bandung. Based on Bandung City’s RTRW year 2011-2031,
Arcamanik District is directed to has a function as housing or residental area.
This residential complex needs some development and construction both in terms
of human sources, administrative facilities and urban infrastructure. One of the
infrastructure that is necessary to developed in this residential complex is Water
Supply System (SPAM). Water sources for drinking water distribution system in
Arcamanik Housing Complex currently using 4 drilled wells, but there only 3
drilled wells that can be used.All of the drill wells that still works is managed by
PDAM Tirtawening Kota Bandung. The water from these drilled wells will be
directed to water reservoir. Planning step is expected to fulfil the water needs for
all of citizen in Arcamanik endak Complex by maximaze the drill well of PDAM
Tirtawening. On the planning stage will be made some alternative distribution
systems using 3 reservoir that the water sources are from the drilled wells.
Planning is done with three alternatives of drinking water distribution network
system which will be selected the best alternative taking into account the technical
criteria for hydraulic, length of pipe and reservoir which is used, as well as
economically viable. Planning is expected to meet drinking water needs in the
area planning both in terms quantity and continuity. |
format |
Final Project |
author |
Ari Ruwaedi, Muhammad |
author_facet |
Ari Ruwaedi, Muhammad |
author_sort |
Ari Ruwaedi, Muhammad |
title |
PERENCANAAN SISTEM JARINGAN DISTRIBUSI AIRMINUM DI KOMPLEK ARCAMANIK ENDAH BANDUNG DAN SEKITARNYA DENGAN SUMBER LEBIH DARI SATU (MULTI SOURCES) |
title_short |
PERENCANAAN SISTEM JARINGAN DISTRIBUSI AIRMINUM DI KOMPLEK ARCAMANIK ENDAH BANDUNG DAN SEKITARNYA DENGAN SUMBER LEBIH DARI SATU (MULTI SOURCES) |
title_full |
PERENCANAAN SISTEM JARINGAN DISTRIBUSI AIRMINUM DI KOMPLEK ARCAMANIK ENDAH BANDUNG DAN SEKITARNYA DENGAN SUMBER LEBIH DARI SATU (MULTI SOURCES) |
title_fullStr |
PERENCANAAN SISTEM JARINGAN DISTRIBUSI AIRMINUM DI KOMPLEK ARCAMANIK ENDAH BANDUNG DAN SEKITARNYA DENGAN SUMBER LEBIH DARI SATU (MULTI SOURCES) |
title_full_unstemmed |
PERENCANAAN SISTEM JARINGAN DISTRIBUSI AIRMINUM DI KOMPLEK ARCAMANIK ENDAH BANDUNG DAN SEKITARNYA DENGAN SUMBER LEBIH DARI SATU (MULTI SOURCES) |
title_sort |
perencanaan sistem jaringan distribusi airminum di komplek arcamanik endah bandung dan sekitarnya dengan sumber lebih dari satu (multi sources) |
url |
https://digilib.itb.ac.id/gdl/view/35549 |
_version_ |
1822924447317753856 |