OPTIMIZATION OF COAL PROCUREMENT NETWORK USING COAL BLENDING METHOD TO MEET THE NEEDS OF POWER PLANT (PLTU)
Cost of procuring coal is the biggest variable that can affect the economic value of a power plant, so optimization needs to be done. One method that can be used is by mixing coal (coal blending) and compiling a coal distribution network. This problem can be solved within the scope of the location r...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/36209 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |