PROJECT MANAGEMENT IN PREPARATION OF ONBOARDING INFORMATION SYSTEM IMPLEMENTATION AT PT TOKOPEDIA

This study focused on the design of project management for preparation preimplementation of the Onboarding information system in one of the largest ecommerce sites in Indonesia, Tokopedia, especially on the Official Store business line. Official Store is a business-to-consumer (B2C) marketplace l...

Full description

Saved in:
Bibliographic Details
Main Author: Olivia Ryan Sabrina, Adinda
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/36537
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:36537
spelling id-itb.:365372019-03-13T13:56:04ZPROJECT MANAGEMENT IN PREPARATION OF ONBOARDING INFORMATION SYSTEM IMPLEMENTATION AT PT TOKOPEDIA Olivia Ryan Sabrina, Adinda Indonesia Final Project hybrid project management, information system implementation, change management, GO-LIVE preparation, GO-LIVE checklist INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/36537 This study focused on the design of project management for preparation preimplementation of the Onboarding information system in one of the largest ecommerce sites in Indonesia, Tokopedia, especially on the Official Store business line. Official Store is a business-to-consumer (B2C) marketplace line at PT Tokopedia which displays official brand stores, official sellers, and web stores that have an exclusive brand value proposition, system integration, and after-sales customer service support. Onboarding information system is a system that aims to improve the acquisition process at the Official Store. The purpose of this study is to design GOLIVE preparation based on the literature of project management and change management in the implementation phase of the Onboarding system and implement the design to produce evaluation and feedback based on time performance criteria, system performance, and points coverage in change management. This research methodology consists of the implementation design phase, implementation and data collection phase, the evaluation design phase, the analysis phase, and conclusions and suggestions. The main methods used in this study are the GO-LIVE checklist (Gefen & Abujudeh, 2017), hybrid project management, Lewin's change management model, and the change management roadmap (Legris & Collerette, 2006). Based on data collection and processing, this study produces details of GO-LIVE preparation activities, project Gantt charts, and change management roadmap checklists which are recommended to be conducted in the preparation of information systems implementation in today’s e-commerce, as well as evaluation and feedback based on the implementation of the design which has been done at PT Tokopedia. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description This study focused on the design of project management for preparation preimplementation of the Onboarding information system in one of the largest ecommerce sites in Indonesia, Tokopedia, especially on the Official Store business line. Official Store is a business-to-consumer (B2C) marketplace line at PT Tokopedia which displays official brand stores, official sellers, and web stores that have an exclusive brand value proposition, system integration, and after-sales customer service support. Onboarding information system is a system that aims to improve the acquisition process at the Official Store. The purpose of this study is to design GOLIVE preparation based on the literature of project management and change management in the implementation phase of the Onboarding system and implement the design to produce evaluation and feedback based on time performance criteria, system performance, and points coverage in change management. This research methodology consists of the implementation design phase, implementation and data collection phase, the evaluation design phase, the analysis phase, and conclusions and suggestions. The main methods used in this study are the GO-LIVE checklist (Gefen & Abujudeh, 2017), hybrid project management, Lewin's change management model, and the change management roadmap (Legris & Collerette, 2006). Based on data collection and processing, this study produces details of GO-LIVE preparation activities, project Gantt charts, and change management roadmap checklists which are recommended to be conducted in the preparation of information systems implementation in today’s e-commerce, as well as evaluation and feedback based on the implementation of the design which has been done at PT Tokopedia.
format Final Project
author Olivia Ryan Sabrina, Adinda
spellingShingle Olivia Ryan Sabrina, Adinda
PROJECT MANAGEMENT IN PREPARATION OF ONBOARDING INFORMATION SYSTEM IMPLEMENTATION AT PT TOKOPEDIA
author_facet Olivia Ryan Sabrina, Adinda
author_sort Olivia Ryan Sabrina, Adinda
title PROJECT MANAGEMENT IN PREPARATION OF ONBOARDING INFORMATION SYSTEM IMPLEMENTATION AT PT TOKOPEDIA
title_short PROJECT MANAGEMENT IN PREPARATION OF ONBOARDING INFORMATION SYSTEM IMPLEMENTATION AT PT TOKOPEDIA
title_full PROJECT MANAGEMENT IN PREPARATION OF ONBOARDING INFORMATION SYSTEM IMPLEMENTATION AT PT TOKOPEDIA
title_fullStr PROJECT MANAGEMENT IN PREPARATION OF ONBOARDING INFORMATION SYSTEM IMPLEMENTATION AT PT TOKOPEDIA
title_full_unstemmed PROJECT MANAGEMENT IN PREPARATION OF ONBOARDING INFORMATION SYSTEM IMPLEMENTATION AT PT TOKOPEDIA
title_sort project management in preparation of onboarding information system implementation at pt tokopedia
url https://digilib.itb.ac.id/gdl/view/36537
_version_ 1821997157696143360