OVERLAY THICKNESS ANALYSIS OF FLEXIBLE PAVEMENT USING AUSTROAD 2010 METHOD AND KENPAVE PROGRAM (CASE STUDY: Freeway CIPALI (Cikopo - Palimanan) Toll Road Km 110 + 000 until 115 + 000)
Toll Road has an important role in order to increase economic development. It is necessary to make roads improvement or increasing road serviceability or minimum service standards (SPM), describes in the PP No. 34 of 2006 regarding roads. TOL CIPALI Road is operated in 2015 which connects between...
Saved in:
Main Author: | Stevenson Lau, Yansen |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/36698 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS EFFECT OF BONDING ON OVERLAY DESIGN USING AUSTROADS METHOD (CASE STUDY : JATIBARANG â PALIMANAN ROADS)
by: Aisyah, Linda -
CONTRACTOR RISK ANALYSIS ON CIKOPO-PALIMANAN TOLL ROAD MAINTENANCE
by: Fitria, Nurlaela -
DEVELOPMENT OF TRAFFIC CRASH PREDICTION MODEL IN CIKOPO â PALIMANAN TOLL ROAD
by: Hidayati, Nirmala -
OVERLAY ANALYSIS ON FLEXIBLE PAVEMENT USING THE DEFLECTION METHOD PD T-05-2005-B, KENPAVE PROGRAM, AND BENEFIT-COST RATIO ANALYSIS
by: Berkat Mido Hasibuan, Afrian -
ROAD MAINTENANCE MANAGEMENT STUDY BASED ON PRESENT SERVICEABILITY INDEX (PSI), PAVEMENT CONDITION INDEX (PCI), AND SURFACE DISTRESS INDEX (SDI) CASE STUDY: CIKOPO-PALIMANAN TOLL ROAD KM 90 - 80 RIGID PAVEMENT
by: Tiara Aisyah, Sonya