DEVELOPMENT OF ASSEMBLY LINE AND OPERATOR ASSIGNMENT MODELS CONSIDERING CLASSIFICATION OF OPERATORS IN FINAL ASSEMBLY LINE

The assembly line in Final Assembly Line (FAL) currently uses the fixed layout concept with 4 stages (post). A stage has several operations, and each operation needs exact classification of operators to process it. To meet orders for type-Y aircraft, FAL usually delay in delivery to the next PT.X in...

Full description

Saved in:
Bibliographic Details
Main Author: Prijo Utomo, Rudy
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/36759
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:36759
spelling id-itb.:367592019-03-15T07:09:03ZDEVELOPMENT OF ASSEMBLY LINE AND OPERATOR ASSIGNMENT MODELS CONSIDERING CLASSIFICATION OF OPERATORS IN FINAL ASSEMBLY LINE Prijo Utomo, Rudy Indonesia Theses Assembly line, makespan, line efficiency, smoothness index. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/36759 The assembly line in Final Assembly Line (FAL) currently uses the fixed layout concept with 4 stages (post). A stage has several operations, and each operation needs exact classification of operators to process it. To meet orders for type-Y aircraft, FAL usually delay in delivery to the next PT.X internal customer, the Delivery Center (DC). The Key Performance Indicator (KPI) reported the average value of FAL Department for a Cycle Time, reached 690%. This value is too far from the objective of the KPI, ? 100%. Even though the FAL is currently targeted to meet the demand of 4 aircrafts/year, it needs an effort to reach a 3 months cycle time. An assembly line model needs to be designed to manage the assignment of operators, and balance the workloads. The proposed model is an analytical model of Mixed Integer Linear Programming (MILP). The objective function of this model is to minimize the makespan, with the inputs are demand and time data available, operating data, operators data and precedence diagrams. And the outputs are operating placement on the work station, operator assignment on operations, start time of each operation, and last operation start time. To achieve the production target of 4 aircraft units/year, the solution of the proposed model produces an assembly line with 4 work stations. The proposed model reduces makespan from 16 months to 8.7 months and do a 293 hours (less than 3 months) of cycle time. This solution model also able to reduce the number of operators, from 83 operators to 77 operators. The computational results also show that the model is able to produce assembly lines that are better than the existing conditions, this is indicated by the increasing line efficiency from 62.67% to 96.5% and decreasing the smoothness index value from 733.48 to 28.51. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The assembly line in Final Assembly Line (FAL) currently uses the fixed layout concept with 4 stages (post). A stage has several operations, and each operation needs exact classification of operators to process it. To meet orders for type-Y aircraft, FAL usually delay in delivery to the next PT.X internal customer, the Delivery Center (DC). The Key Performance Indicator (KPI) reported the average value of FAL Department for a Cycle Time, reached 690%. This value is too far from the objective of the KPI, ? 100%. Even though the FAL is currently targeted to meet the demand of 4 aircrafts/year, it needs an effort to reach a 3 months cycle time. An assembly line model needs to be designed to manage the assignment of operators, and balance the workloads. The proposed model is an analytical model of Mixed Integer Linear Programming (MILP). The objective function of this model is to minimize the makespan, with the inputs are demand and time data available, operating data, operators data and precedence diagrams. And the outputs are operating placement on the work station, operator assignment on operations, start time of each operation, and last operation start time. To achieve the production target of 4 aircraft units/year, the solution of the proposed model produces an assembly line with 4 work stations. The proposed model reduces makespan from 16 months to 8.7 months and do a 293 hours (less than 3 months) of cycle time. This solution model also able to reduce the number of operators, from 83 operators to 77 operators. The computational results also show that the model is able to produce assembly lines that are better than the existing conditions, this is indicated by the increasing line efficiency from 62.67% to 96.5% and decreasing the smoothness index value from 733.48 to 28.51.
format Theses
author Prijo Utomo, Rudy
spellingShingle Prijo Utomo, Rudy
DEVELOPMENT OF ASSEMBLY LINE AND OPERATOR ASSIGNMENT MODELS CONSIDERING CLASSIFICATION OF OPERATORS IN FINAL ASSEMBLY LINE
author_facet Prijo Utomo, Rudy
author_sort Prijo Utomo, Rudy
title DEVELOPMENT OF ASSEMBLY LINE AND OPERATOR ASSIGNMENT MODELS CONSIDERING CLASSIFICATION OF OPERATORS IN FINAL ASSEMBLY LINE
title_short DEVELOPMENT OF ASSEMBLY LINE AND OPERATOR ASSIGNMENT MODELS CONSIDERING CLASSIFICATION OF OPERATORS IN FINAL ASSEMBLY LINE
title_full DEVELOPMENT OF ASSEMBLY LINE AND OPERATOR ASSIGNMENT MODELS CONSIDERING CLASSIFICATION OF OPERATORS IN FINAL ASSEMBLY LINE
title_fullStr DEVELOPMENT OF ASSEMBLY LINE AND OPERATOR ASSIGNMENT MODELS CONSIDERING CLASSIFICATION OF OPERATORS IN FINAL ASSEMBLY LINE
title_full_unstemmed DEVELOPMENT OF ASSEMBLY LINE AND OPERATOR ASSIGNMENT MODELS CONSIDERING CLASSIFICATION OF OPERATORS IN FINAL ASSEMBLY LINE
title_sort development of assembly line and operator assignment models considering classification of operators in final assembly line
url https://digilib.itb.ac.id/gdl/view/36759
_version_ 1822924709007720448