Redesign of Leachate Treatment Plant of Selopuro Landfill in Ngawi Regency East Java
Selopuro landfill is located in Selopuro Village, Pitu District, Ngawi Regency. Selopuro landfill began operations since 1995 and began operating in a sanitary landfill since 2015. The service area of the Selopuro landfill is a sub-district of Ngawi consisting of 12 villages and 4 sub-sub-districts....
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/36834 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:36834 |
---|---|
spelling |
id-itb.:368342019-03-15T13:15:44ZRedesign of Leachate Treatment Plant of Selopuro Landfill in Ngawi Regency East Java Isyarani, Destiana Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project landfill, leachate, stabilization ponds, aeration INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/36834 Selopuro landfill is located in Selopuro Village, Pitu District, Ngawi Regency. Selopuro landfill began operations since 1995 and began operating in a sanitary landfill since 2015. The service area of the Selopuro landfill is a sub-district of Ngawi consisting of 12 villages and 4 sub-sub-districts. Selopuro land has an existing leachate treatment plant which is stabilization ponds. This series of stabilization ponds consists of anaerobic ponds, facultative ponds divided into 3 cells, maturation ponds divided into 3 cells, and constructed wetland. This leachate treatment plant produces effluent which exceeds the quality standard of Peraturan Menteri Lingkungan Hidup dan Kehutanan RI Nomor 59 tahun 2016, namely the BOD parameter of 945 mg / l, COD of 3050 mg / l, TSS of 250 mg / l, and Nitrogen Total of 129.5 mg / l. Based on the Thorntwaite method, the leachate discharge produced was 0.14 liters/second or 0.28 liters/second/hectare. Therefore it was redesigned by utilizing existing processing plants. Redesign is done by adding surface aerators to facultative ponds with a power of 1.5 hp in the first cell and 0.5 hp in the second and third cells and increasing the elevation of the maturas pond datum by adding a concrete plate so that the depth becomes 1.5 m and replacing the soil media and wetland vegetation. This upgrade results in BOD removal efficiency of up to 99%. The budget plan required for this redesign is Rp.500,973,446.30 with operational costs of Rp.22,984,090.23, per year. Additional recommendations proposed is the need to build a recirculation system towards landfill to handle fluctuations in leachate quality and maintenance of ponds text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan |
spellingShingle |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan Isyarani, Destiana Redesign of Leachate Treatment Plant of Selopuro Landfill in Ngawi Regency East Java |
description |
Selopuro landfill is located in Selopuro Village, Pitu District, Ngawi Regency. Selopuro landfill began operations since 1995 and began operating in a sanitary landfill since 2015. The service area of the Selopuro landfill is a sub-district of Ngawi consisting of 12 villages and 4 sub-sub-districts. Selopuro land has an existing leachate treatment plant which is stabilization ponds. This series of stabilization ponds consists of anaerobic ponds, facultative ponds divided into 3 cells, maturation ponds divided into 3 cells, and constructed wetland. This leachate treatment plant produces effluent which exceeds the quality standard of Peraturan Menteri Lingkungan Hidup dan Kehutanan RI Nomor 59 tahun 2016, namely the BOD parameter of 945 mg / l, COD of 3050 mg / l, TSS of 250 mg / l, and Nitrogen Total of 129.5 mg / l. Based on the Thorntwaite method, the leachate discharge produced was 0.14 liters/second or 0.28 liters/second/hectare. Therefore it was redesigned by utilizing existing processing plants. Redesign is done by adding surface aerators to facultative ponds with a power of 1.5 hp in the first cell and 0.5 hp in the second and third cells and increasing the elevation of the maturas pond datum by adding a concrete plate so that the depth becomes 1.5 m and replacing the soil media and wetland vegetation. This upgrade results in BOD removal efficiency of up to 99%. The budget plan required for this redesign is Rp.500,973,446.30 with operational costs of Rp.22,984,090.23, per year. Additional recommendations proposed is the need to build a recirculation system towards landfill to handle fluctuations in leachate quality and maintenance of ponds |
format |
Final Project |
author |
Isyarani, Destiana |
author_facet |
Isyarani, Destiana |
author_sort |
Isyarani, Destiana |
title |
Redesign of Leachate Treatment Plant of Selopuro Landfill in Ngawi Regency East Java |
title_short |
Redesign of Leachate Treatment Plant of Selopuro Landfill in Ngawi Regency East Java |
title_full |
Redesign of Leachate Treatment Plant of Selopuro Landfill in Ngawi Regency East Java |
title_fullStr |
Redesign of Leachate Treatment Plant of Selopuro Landfill in Ngawi Regency East Java |
title_full_unstemmed |
Redesign of Leachate Treatment Plant of Selopuro Landfill in Ngawi Regency East Java |
title_sort |
redesign of leachate treatment plant of selopuro landfill in ngawi regency east java |
url |
https://digilib.itb.ac.id/gdl/view/36834 |
_version_ |
1822268774977372160 |