PERENCANAAN DESAIN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CISOMANG, KABUPATEN PURWAKARTA, JAWA BARAT

Energy is one of the important aspects needed by the human as well as being the eighth priority in Indonesia's national development. There are only 230 MW of 450 MW of electricity potential that has been realized through mini / micro hydro infrastructure. This study located in the Cisomang R...

Full description

Saved in:
Bibliographic Details
Main Author: Irfan Azinudin, Muhammad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/36888
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:36888
spelling id-itb.:368882019-03-15T15:13:57ZPERENCANAAN DESAIN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CISOMANG, KABUPATEN PURWAKARTA, JAWA BARAT Irfan Azinudin, Muhammad Indonesia Final Project Energy, dependable discharge, Sacramento mode, power, minihydro power plant. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/36888 Energy is one of the important aspects needed by the human as well as being the eighth priority in Indonesia's national development. There are only 230 MW of 450 MW of electricity potential that has been realized through mini / micro hydro infrastructure. This study located in the Cisomang River, Purwakarta Regency, West Java, has a watershed area of 39,1 km2. Recorded rainfall for 14 years (2004-2017) at Cisomang rain station and Cipeusing station was chosen to be used as input data in modeling to obtain planning discharge criteria. The planning discharge intended in this study is a reliable discharge. The mainstay discharge plan is determined by 50% reliability (Q50%). Based on the Sacramento method modeling results obtained discharge with 50% reliability of 2,17 m3/ s (Q50% = 2,17 m3 / s). With Q50% = 2,17 m3/ s and elevation differences in the study area of 130 m, turbine efficiency values of 95% and generator efficiency of 95% are used, so the construction of the Cisomang power plant is planned to produce theoretical power of 2 x 1,3 MW. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Energy is one of the important aspects needed by the human as well as being the eighth priority in Indonesia's national development. There are only 230 MW of 450 MW of electricity potential that has been realized through mini / micro hydro infrastructure. This study located in the Cisomang River, Purwakarta Regency, West Java, has a watershed area of 39,1 km2. Recorded rainfall for 14 years (2004-2017) at Cisomang rain station and Cipeusing station was chosen to be used as input data in modeling to obtain planning discharge criteria. The planning discharge intended in this study is a reliable discharge. The mainstay discharge plan is determined by 50% reliability (Q50%). Based on the Sacramento method modeling results obtained discharge with 50% reliability of 2,17 m3/ s (Q50% = 2,17 m3 / s). With Q50% = 2,17 m3/ s and elevation differences in the study area of 130 m, turbine efficiency values of 95% and generator efficiency of 95% are used, so the construction of the Cisomang power plant is planned to produce theoretical power of 2 x 1,3 MW.
format Final Project
author Irfan Azinudin, Muhammad
spellingShingle Irfan Azinudin, Muhammad
PERENCANAAN DESAIN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CISOMANG, KABUPATEN PURWAKARTA, JAWA BARAT
author_facet Irfan Azinudin, Muhammad
author_sort Irfan Azinudin, Muhammad
title PERENCANAAN DESAIN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CISOMANG, KABUPATEN PURWAKARTA, JAWA BARAT
title_short PERENCANAAN DESAIN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CISOMANG, KABUPATEN PURWAKARTA, JAWA BARAT
title_full PERENCANAAN DESAIN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CISOMANG, KABUPATEN PURWAKARTA, JAWA BARAT
title_fullStr PERENCANAAN DESAIN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CISOMANG, KABUPATEN PURWAKARTA, JAWA BARAT
title_full_unstemmed PERENCANAAN DESAIN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CISOMANG, KABUPATEN PURWAKARTA, JAWA BARAT
title_sort perencanaan desain pembangkit listrik tenaga minihidro cisomang, kabupaten purwakarta, jawa barat
url https://digilib.itb.ac.id/gdl/view/36888
_version_ 1822924762217709568