PERANCANGAN SISTEM PLAMBING AIR LIMBAH GEDUNG RASUNA SAID OFFICE TOWER, JAKARTA

Tower building is a building type that is commonly used for human activities in many ways one of which as an office function. Tower building is an efficient building for a minimal availability of land in urban areas that are considered suitable for a variety of functions including the office func...

Full description

Saved in:
Bibliographic Details
Main Author: Ega Prawira, Harpa
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/36959
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:36959
spelling id-itb.:369592019-03-18T09:25:31ZPERANCANGAN SISTEM PLAMBING AIR LIMBAH GEDUNG RASUNA SAID OFFICE TOWER, JAKARTA Ega Prawira, Harpa Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project design, domestic waste water, plumbing, rain water harvesting INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/36959 Tower building is a building type that is commonly used for human activities in many ways one of which as an office function. Tower building is an efficient building for a minimal availability of land in urban areas that are considered suitable for a variety of functions including the office function, such as Rasuna Said rental office Building, Jakarta. Every human activity or business basically impact on the environment so that is necessary to control negative impacts as early as possible. One of the waste that generated by the office activity in the building is domestic wastewater. And there are also rain water runoff that must be controlled. So, it is necessary to design sewage and drainage system as an control to the impact. The design method is divided into the study of literature as an initial procedure, collecting supporting data, and the last one is planning phase. Based on the results of the design, the range size of pipe diameter is about 50- 250mm for blackwater and for greywater 32-150 mm..And slope for piping between 1/50 - 1/100. For vent piping system, the size range is about 32-150 mm. Basically the sewage system is divided into greywater and blackwater in accordance with the designation initially, in addition, the entire sewage system implementing gravity force.Therefore, drainage system utilize piping and guttermethod. And rain water also used as a source of fresh water for rain water harvesting in this building. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik saniter dan perkotaan; teknik perlindungan lingkungan
spellingShingle Teknik saniter dan perkotaan; teknik perlindungan lingkungan
Ega Prawira, Harpa
PERANCANGAN SISTEM PLAMBING AIR LIMBAH GEDUNG RASUNA SAID OFFICE TOWER, JAKARTA
description Tower building is a building type that is commonly used for human activities in many ways one of which as an office function. Tower building is an efficient building for a minimal availability of land in urban areas that are considered suitable for a variety of functions including the office function, such as Rasuna Said rental office Building, Jakarta. Every human activity or business basically impact on the environment so that is necessary to control negative impacts as early as possible. One of the waste that generated by the office activity in the building is domestic wastewater. And there are also rain water runoff that must be controlled. So, it is necessary to design sewage and drainage system as an control to the impact. The design method is divided into the study of literature as an initial procedure, collecting supporting data, and the last one is planning phase. Based on the results of the design, the range size of pipe diameter is about 50- 250mm for blackwater and for greywater 32-150 mm..And slope for piping between 1/50 - 1/100. For vent piping system, the size range is about 32-150 mm. Basically the sewage system is divided into greywater and blackwater in accordance with the designation initially, in addition, the entire sewage system implementing gravity force.Therefore, drainage system utilize piping and guttermethod. And rain water also used as a source of fresh water for rain water harvesting in this building.
format Final Project
author Ega Prawira, Harpa
author_facet Ega Prawira, Harpa
author_sort Ega Prawira, Harpa
title PERANCANGAN SISTEM PLAMBING AIR LIMBAH GEDUNG RASUNA SAID OFFICE TOWER, JAKARTA
title_short PERANCANGAN SISTEM PLAMBING AIR LIMBAH GEDUNG RASUNA SAID OFFICE TOWER, JAKARTA
title_full PERANCANGAN SISTEM PLAMBING AIR LIMBAH GEDUNG RASUNA SAID OFFICE TOWER, JAKARTA
title_fullStr PERANCANGAN SISTEM PLAMBING AIR LIMBAH GEDUNG RASUNA SAID OFFICE TOWER, JAKARTA
title_full_unstemmed PERANCANGAN SISTEM PLAMBING AIR LIMBAH GEDUNG RASUNA SAID OFFICE TOWER, JAKARTA
title_sort perancangan sistem plambing air limbah gedung rasuna said office tower, jakarta
url https://digilib.itb.ac.id/gdl/view/36959
_version_ 1822924778545086464