KAJIAN AWAL SISTEM PEMBANGKIT LISTRIK DENGAN BAHAN BAKAR SAMPAH KOTA SKALA 500 TON/HARI
The first design of municipal solid waste power generating system has been finished. This system is named PLTSa (Pembangkit Listrik Tenaga Sampah Kota). It has capacity 500 ton a day. The generator produces almost 6,955 MW electric energy with almost 19,64 % system efficiency. The operation cond...
Saved in:
Main Author: | ISWADI, RURI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/37492 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
KAJIAN AWAL SISTEM PEMBANGKIT LISTRIK DENGAN BAHAN BAKAR SAMPAH KOTA SKALA 500 TON/HARI
by: Iswadi , Ruri -
PEMANFAATAN RESONANSI GELOMBANG UNTUK PEMBANGKIT ENERGI LISTRIK
by: Hasan Achmad, Nur -
PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO CILEUNCA, PENGALENGAN, JAWA BARAT
by: Rifqi Asyraf Wardono, Muhammad -
JARINGAN SYARAF TIRUAN SEBAGAI PENGENDALI ADAPTIF PADA MODEL PEMBANGKIT LISTRIK TENAGA UAP
by: Lanny Widyastuti Pandjaitan, M.M. -
ANALISIS TWO TANK STORAGE PADA PEMBANGKIT LISTRIK TENAGA SURYA BERBASIS THERMAL DI INDONESIA
by: Azka, Muhammad