TECHNO ECONOMIC ANALYSIS OF COMBINED ORGANIC RANKINE CYCLE AND LNG REGASIFICATION SYSTEM FOR POWER PLANT GAS SUPPLY

Necessity for long term electricity development is being forced by PLN requirement to develop efficient investment plan, as stated in Indonesia’s Power Supply Business Plan (RUPTL) 2018. This thing is important to be done because investment decision in the electrical power supply industry benefit...

Full description

Saved in:
Bibliographic Details
Main Author: Habib Chusnul Fikri, M
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/37885
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first