Consumption and electricity needs in Indonesia continue to increase by year. At the moment, energy source for generating electricity is still dominated by non renewable energy, especially fossil fuels, such as coals and petrol oils, which contribute more than 85% from the total national electricit...

Full description

Saved in:
Bibliographic Details
Main Author: Putro Budiyanto, Haryo
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/38115
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:38115
spelling id-itb.:381152019-05-07T12:58:03ZDesign, Simulation, Manufacturing, and Testing of Savonius Wind Turbine with Overlap Ratio Variation Putro Budiyanto, Haryo Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project Savonius Wind Turbine, Overlap Ratio, CFD Simulation, Turbine Performance INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/38115 Consumption and electricity needs in Indonesia continue to increase by year. At the moment, energy source for generating electricity is still dominated by non renewable energy, especially fossil fuels, such as coals and petrol oils, which contribute more than 85% from the total national electricity production. Indonesia has so many renewable energy resources that can be converted to electricity, where one of them is wind energy. Wind energy potential in Indonesia is about 9.3 GW in total, but only used for 1.12 MW in national electricity production. The data shows that it is a huge challenge to increase the electricity production by using wind as energy source. The purpose of the study was making an energy conversion system using savonius wind turbine. This research required a simulation of the savonius wind turbine with some variations of overlap ratio as a main focus to obtain the best mechanical power and coefficient of performance. The numbers of overlap ratio are 0, 0.1, 0.2, 0.3. CFD-based simulation was applied on the wind turbine design. After the simulation process, the next step was manufacturing of the wind turbine system and examining the simulation result compared to the actual condition by testing of the system. Based on the simulation process, wind turbine with overlap ratio 0.3 generated the highest coefficient of performance by 0.171, and turbine with overlap ratio 0.1 produced the biggest mechanical power by 0.5 watt on 2 m/s wind velovity, and 32 watt on 8 m/s wind velocity. The testing resulted that the total efficiency is 0.29%. The effects of friction on the bearing, pulley, belt, gearbox, and also the used of generator that unsuitable with low rotation, made the number of overall efficiency was relatively small. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Putro Budiyanto, Haryo
Design, Simulation, Manufacturing, and Testing of Savonius Wind Turbine with Overlap Ratio Variation
description Consumption and electricity needs in Indonesia continue to increase by year. At the moment, energy source for generating electricity is still dominated by non renewable energy, especially fossil fuels, such as coals and petrol oils, which contribute more than 85% from the total national electricity production. Indonesia has so many renewable energy resources that can be converted to electricity, where one of them is wind energy. Wind energy potential in Indonesia is about 9.3 GW in total, but only used for 1.12 MW in national electricity production. The data shows that it is a huge challenge to increase the electricity production by using wind as energy source. The purpose of the study was making an energy conversion system using savonius wind turbine. This research required a simulation of the savonius wind turbine with some variations of overlap ratio as a main focus to obtain the best mechanical power and coefficient of performance. The numbers of overlap ratio are 0, 0.1, 0.2, 0.3. CFD-based simulation was applied on the wind turbine design. After the simulation process, the next step was manufacturing of the wind turbine system and examining the simulation result compared to the actual condition by testing of the system. Based on the simulation process, wind turbine with overlap ratio 0.3 generated the highest coefficient of performance by 0.171, and turbine with overlap ratio 0.1 produced the biggest mechanical power by 0.5 watt on 2 m/s wind velovity, and 32 watt on 8 m/s wind velocity. The testing resulted that the total efficiency is 0.29%. The effects of friction on the bearing, pulley, belt, gearbox, and also the used of generator that unsuitable with low rotation, made the number of overall efficiency was relatively small.
format Final Project
author Putro Budiyanto, Haryo
author_facet Putro Budiyanto, Haryo
author_sort Putro Budiyanto, Haryo
title Design, Simulation, Manufacturing, and Testing of Savonius Wind Turbine with Overlap Ratio Variation
title_short Design, Simulation, Manufacturing, and Testing of Savonius Wind Turbine with Overlap Ratio Variation
title_full Design, Simulation, Manufacturing, and Testing of Savonius Wind Turbine with Overlap Ratio Variation
title_fullStr Design, Simulation, Manufacturing, and Testing of Savonius Wind Turbine with Overlap Ratio Variation
title_full_unstemmed Design, Simulation, Manufacturing, and Testing of Savonius Wind Turbine with Overlap Ratio Variation
title_sort design, simulation, manufacturing, and testing of savonius wind turbine with overlap ratio variation
url https://digilib.itb.ac.id/gdl/view/38115
_version_ 1821997453232046080