ANALYSIS OF CONGESTION COST ON IHE ROAD IN BANDUNG
The issue of congestion, esspecialiy on roads in urban areas, latety become an issue that gets the attention of various parties. Congestion occurs due to several factors such as the ratio of the volume of traffic with the traffic capacity is too laige and the presence of activity in addition to the...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/38190 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The issue of congestion, esspecialiy on roads in urban areas, latety become an issue that gets the attention of various parties. Congestion occurs due to several factors such as the ratio of the volume of traffic with the traffic capacity is too laige and the presence of activity in addition to the road using die sfaoul^r of the road or the road. The direct inqiact due to the congestkm eiqierimced by road users is making consunqition of fuel and travel time eiqierienced by road users.
Bandung, as one of the major cities in Indonesia, has a serious congestion problems. Roads are congested increasingly. Various attempts have been made to resolve the issue. But until now die congestion is still one of the problems
experienced by the user community in urban areas.
This study examines the problems of congestion, particularly issues losses / costs experioiced by road users. Research conducted in Jalan Soekamo Hatta road between intersections Mob. Toha the intersection Pasir Koja, which consists of 3 (three) segments, Moh. Toha - Cibaduyut segment, Cibaduyut - Kopo segment, and Kopo - Pasir Koja segment. Components of congestion costs are taken into
account in this study is die vdticle operating costs and travel time value.
The ressult showed congestion cost experioiced by the vehicle through each segment during the 12 hours of research (06.00 - 18.00) is Moh Toha - Cibaduyut segm^t Rp. 59.765.272, Cibaduyut - Moh. Tdia segment Rp.77.678.672, Cibaduyut - Kopo segment Rp. 109.225.398, Kopo - Cibaduyut
segment Rp. 73.421.072, Kopo - Pasir Koja segment Rp. 34.437.869, Pasir Koja - Kopo segment Rp. 33.612213.
These results provide a signal to all stakeholders, especially the city government to start paying attention to the road paformance. Required solutions include traffic sigineering mmures and policy restrictions on the use of private vehicle
and public transport fecility improvements. |
---|