PT AEI PREFERRED ALTERNATIVE PROJECT ON âXâ FIELD IN NEAR EXPIRATION OF PSC INDONESIA CONTRACT PERIOD REFERRING TO INVESTMENT ANALYSIS
PT AEI (Andalan Energy Indonesia) is one of PSC Indonesia Contractor operates in Sumatra. During contract period, Contractor has obligation to deliver oil production as per agreed target. Considering short runaway of remaining PT AEI PSC period, drilling new wells which requires high capital likely...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/38807 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |