EVALUATION OF THE BITCOIN MINING PROJECT FOR 5-YEARS PERIOD USING REAL OPTIONS WITH LEARNING PROCESS
Bitcoin is one type of cryptocurrency that is very potential to be used as investment because it has volatile price fluctuations with high volatility. In this final project, the real options method that we used as a strategy analysis method to model the decision making to maximize the investment...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/38882 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:38882 |
---|---|
spelling |
id-itb.:388822019-06-19T11:02:15ZEVALUATION OF THE BITCOIN MINING PROJECT FOR 5-YEARS PERIOD USING REAL OPTIONS WITH LEARNING PROCESS Andika Dani Fajar Suryawa, Febi Indonesia Final Project bitcoin, mining, real options, learning process, binomial method, trinomial method INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/38882 Bitcoin is one type of cryptocurrency that is very potential to be used as investment because it has volatile price fluctuations with high volatility. In this final project, the real options method that we used as a strategy analysis method to model the decision making to maximize the investment made in the bitcoin mining project for 5-years period. Bitcoin is a high risk asset so learning about the project before making an investment will have an impact on the return of the project. The real options method with learning process feature is used as a strategy analysis for running bitcoin mining project. The method that we used for the valuation of project and real options are binomial method with time varying and trinomial method with volatility changing. Strategy analysis is needed to model the decision making in the future in order to maximize the return of investment on the project. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Bitcoin is one type of cryptocurrency that is very potential to be used as investment
because it has volatile price fluctuations with high volatility. In this final project, the
real options method that we used as a strategy analysis method to model the decision
making to maximize the investment made in the bitcoin mining project for 5-years
period. Bitcoin is a high risk asset so learning about the project before making
an investment will have an impact on the return of the project. The real options
method with learning process feature is used as a strategy analysis for running
bitcoin mining project. The method that we used for the valuation of project and real
options are binomial method with time varying and trinomial method with volatility
changing. Strategy analysis is needed to model the decision making in the future in
order to maximize the return of investment on the project. |
format |
Final Project |
author |
Andika Dani Fajar Suryawa, Febi |
spellingShingle |
Andika Dani Fajar Suryawa, Febi EVALUATION OF THE BITCOIN MINING PROJECT FOR 5-YEARS PERIOD USING REAL OPTIONS WITH LEARNING PROCESS |
author_facet |
Andika Dani Fajar Suryawa, Febi |
author_sort |
Andika Dani Fajar Suryawa, Febi |
title |
EVALUATION OF THE BITCOIN MINING PROJECT FOR 5-YEARS PERIOD USING REAL OPTIONS WITH LEARNING PROCESS |
title_short |
EVALUATION OF THE BITCOIN MINING PROJECT FOR 5-YEARS PERIOD USING REAL OPTIONS WITH LEARNING PROCESS |
title_full |
EVALUATION OF THE BITCOIN MINING PROJECT FOR 5-YEARS PERIOD USING REAL OPTIONS WITH LEARNING PROCESS |
title_fullStr |
EVALUATION OF THE BITCOIN MINING PROJECT FOR 5-YEARS PERIOD USING REAL OPTIONS WITH LEARNING PROCESS |
title_full_unstemmed |
EVALUATION OF THE BITCOIN MINING PROJECT FOR 5-YEARS PERIOD USING REAL OPTIONS WITH LEARNING PROCESS |
title_sort |
evaluation of the bitcoin mining project for 5-years period using real options with learning process |
url |
https://digilib.itb.ac.id/gdl/view/38882 |
_version_ |
1821997630008328192 |