INVESTMENT PROJECT ANALYSIS FOR PIPELINE SEGMENTAL REPLACEMENT AS PART OF COMPREHENSIVE PIPELINE MAINTENANCE (CPM) PROGRAM

PT. Chevron Pacific Indonesia (CPI), as operator of SKK Migas with working area at Rokan Block PSC is the main crude oil producer for Indonesia’s national oil production since more than nine (9) decades ago. The crude oil have been produced from several oil fields that located scatter across Riau Pr...

Full description

Saved in:
Bibliographic Details
Main Author: Boediarto, Gunawan
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/39383
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:39383
spelling id-itb.:393832019-06-26T10:20:26ZINVESTMENT PROJECT ANALYSIS FOR PIPELINE SEGMENTAL REPLACEMENT AS PART OF COMPREHENSIVE PIPELINE MAINTENANCE (CPM) PROGRAM Boediarto, Gunawan Manajemen umum Indonesia Theses Project investment analysis, Discounted Cash Flow method (DCF), Sensitivity Analysis. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39383 PT. Chevron Pacific Indonesia (CPI), as operator of SKK Migas with working area at Rokan Block PSC is the main crude oil producer for Indonesia’s national oil production since more than nine (9) decades ago. The crude oil have been produced from several oil fields that located scatter across Riau Province. On each oil fields there are production facilities consisting of wells, distribution pipelines, oil treating facilities up to shipping pipeline facilities to transmit crude oil to the export terminal in Dumai. Some of those facilities have reached the end of their operating life, this is including production pipeline in the Bangko Northern field. To secure oil production from Bangko Northern field, it is necessary to conduct a comprehensive pipeline maintenance program by replacing the pipeline segment in the Road Crossing (RC) section. The objective of this final project is to study the financial analysis of the pipeline segmental replacement project to assess the costs and benefits of the proposed investment project based on the available alternatives for pipeline segmental replacement. Discounted Cash Flow (DCF) method and Financial Sensitivity Analysis are used as financial tools to understand the economics of proposed investment project. The information generated from this analysis will provide financial information whether the investment for pipeline segmental replacement is attractive or not to be executed. The financial analysis will refer to Conventional PSC terms. For the decision making process, the decision criteria is the highest NPV value that generated from the available alternatives and proceed with Decision Tree analysis. After the most financially attractive alternative have been identified, then it will be determined the amount of the opportunity cost that arise due to selection of the preferred alternative if compared with the not selected alternatives. Results from the financial analysis inform that selected pipeline segmental replacement – Alternative 1 generates positive NPV = $ 39.195 millions, IRR = 645 %; greater than the company discount rate, high PI = 15 and short payback period (PBP) = 1.8 months. Therefore segmental pipeline replacement project is feasible to be executed soon start in Q2 2019. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Boediarto, Gunawan
INVESTMENT PROJECT ANALYSIS FOR PIPELINE SEGMENTAL REPLACEMENT AS PART OF COMPREHENSIVE PIPELINE MAINTENANCE (CPM) PROGRAM
description PT. Chevron Pacific Indonesia (CPI), as operator of SKK Migas with working area at Rokan Block PSC is the main crude oil producer for Indonesia’s national oil production since more than nine (9) decades ago. The crude oil have been produced from several oil fields that located scatter across Riau Province. On each oil fields there are production facilities consisting of wells, distribution pipelines, oil treating facilities up to shipping pipeline facilities to transmit crude oil to the export terminal in Dumai. Some of those facilities have reached the end of their operating life, this is including production pipeline in the Bangko Northern field. To secure oil production from Bangko Northern field, it is necessary to conduct a comprehensive pipeline maintenance program by replacing the pipeline segment in the Road Crossing (RC) section. The objective of this final project is to study the financial analysis of the pipeline segmental replacement project to assess the costs and benefits of the proposed investment project based on the available alternatives for pipeline segmental replacement. Discounted Cash Flow (DCF) method and Financial Sensitivity Analysis are used as financial tools to understand the economics of proposed investment project. The information generated from this analysis will provide financial information whether the investment for pipeline segmental replacement is attractive or not to be executed. The financial analysis will refer to Conventional PSC terms. For the decision making process, the decision criteria is the highest NPV value that generated from the available alternatives and proceed with Decision Tree analysis. After the most financially attractive alternative have been identified, then it will be determined the amount of the opportunity cost that arise due to selection of the preferred alternative if compared with the not selected alternatives. Results from the financial analysis inform that selected pipeline segmental replacement – Alternative 1 generates positive NPV = $ 39.195 millions, IRR = 645 %; greater than the company discount rate, high PI = 15 and short payback period (PBP) = 1.8 months. Therefore segmental pipeline replacement project is feasible to be executed soon start in Q2 2019.
format Theses
author Boediarto, Gunawan
author_facet Boediarto, Gunawan
author_sort Boediarto, Gunawan
title INVESTMENT PROJECT ANALYSIS FOR PIPELINE SEGMENTAL REPLACEMENT AS PART OF COMPREHENSIVE PIPELINE MAINTENANCE (CPM) PROGRAM
title_short INVESTMENT PROJECT ANALYSIS FOR PIPELINE SEGMENTAL REPLACEMENT AS PART OF COMPREHENSIVE PIPELINE MAINTENANCE (CPM) PROGRAM
title_full INVESTMENT PROJECT ANALYSIS FOR PIPELINE SEGMENTAL REPLACEMENT AS PART OF COMPREHENSIVE PIPELINE MAINTENANCE (CPM) PROGRAM
title_fullStr INVESTMENT PROJECT ANALYSIS FOR PIPELINE SEGMENTAL REPLACEMENT AS PART OF COMPREHENSIVE PIPELINE MAINTENANCE (CPM) PROGRAM
title_full_unstemmed INVESTMENT PROJECT ANALYSIS FOR PIPELINE SEGMENTAL REPLACEMENT AS PART OF COMPREHENSIVE PIPELINE MAINTENANCE (CPM) PROGRAM
title_sort investment project analysis for pipeline segmental replacement as part of comprehensive pipeline maintenance (cpm) program
url https://digilib.itb.ac.id/gdl/view/39383
_version_ 1822925275841691648