OIL WELL PUT ON PRODUCTION CYCLE TIME IMPROVEMENT AT IOC-CORP USING LEAN SIX SIGMA METHODOLOGY
The oil and gas industry’s contribution to the state revenue in Indonesia has fallen sharply from 14% in 2014 to 5% in 2017 as the result of declining oil price and declining oil production. IOC-Corp as one of the major oil company in Indonesia was not excluded from the impact of persistent oil pric...
Saved in:
Main Author: | Sujana Putra, Doni |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/39553 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
WELL WORKOVER PROGRAM DEVELOPMENT PROCESS IMPROVEMENT BY USING LEAN SIX SIGMA FRAMEWORK AT SUMATERA OIL COMPANY
by: Arianto Tampubolon, Daniel -
IMPROVING WELL SERVICE CYCLE TIME IN RIG HUB WELLS DEPARTMENT THROUGH LEAN SIGMA METHODOLOGY (A CASE STUDY OF PT. BELVIS)
by: Wibowo, Kristanto -
CONTINUOUS IMPROVEMENT OF DRILLING ULTRA-SHALLOW HORIZONTAL WELL THROUGH LEAN SIX SIGMA METHODOLOGY (Study Case: UP* Field in PT. SDEC*)
by: Tri Wahyudi, Petrus -
INCREASING PRODUCTION CAPACITY OF RACK STEERING LINE AT PT.ABC USING LEAN SIX SIGMA METHODOLOGY
by: Harasta Fadruzil, Farhan -
BUSINESS PROCESS IMPROVEMENT IN CALL CENTER OPERATIONS AT XYZ MALAYSIA THROUGH THE IMPLEMENTATION OF LEAN SIX SIGMA METHODOLOGIES
by: Andini, Trisnawati