REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA
TPS Kedurus services 8 out of 9 RW in Kelurahan Kedurus with service area is 1 km2 and 21,558 people. Waste generation from the activity is 53,335 m3/day or 2.5 liter/person/day. The planning area for TPS 3R is 1000 m2. Based on Permen PUPR 10/2017, TPS which has area of 1000 m2 is capable to serve...
Saved in:
Main Author: | Ulfah Zatadini, Sharfina |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/39618 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA
by: Ulfah Zatadini, Sharfina -
REDESIGN OF TPS 3R AND INORGANIC WASTE TREATMENT INSTALLATION AT TPS 3R DESA MERBUNG, SOUTH KLATEN, KLATEN, CENTRAL JAVA
by: Saraswati, Dianisti -
REDESIGNING WASTE TEMPORARY SHELTER (TPS) SUCI BANDUNG INTO A REDUCE, REUSE, AND RECYCLE BASED WASTE MANAGEMENT FACILITY (TPS 3R)
by: Riskita Marina, Trie -
REDESIGN AND OPTIMIZATION OF WASTE MANAGEMENT SYSTEM IN TPS 3R SUBANG, ANTAPANI SUBDISTRICT, BANDUNG CITY
by: Resti Anjany, Gina -
ANALYSIS OF FOOD WASTE BEHAVIOR AND COMMUNITY PARTICIPATION IN FOOD WASTE REDUCTION AT HOUSEHOLD LEVEL IN BANDUNG
by: Ulfah Zatadini, Sharfina