REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA
TPS Kedurus services 8 out of 9 RW in Kelurahan Kedurus with service area is 1 km2 and 21,558 people. Waste generation from the activity is 53,335 m3/day or 2.5 liter/person/day. The planning area for TPS 3R is 1000 m2. Based on Permen PUPR 10/2017, TPS which has area of 1000 m2 is capable to serve...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/39619 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:39619 |
---|---|
spelling |
id-itb.:396192019-06-27T11:19:40ZREDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA Ulfah Zatadini, Sharfina Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project Kedurus, inorganic waste, organic waste, TPS 3R, waste treatment INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39619 TPS Kedurus services 8 out of 9 RW in Kelurahan Kedurus with service area is 1 km2 and 21,558 people. Waste generation from the activity is 53,335 m3/day or 2.5 liter/person/day. The planning area for TPS 3R is 1000 m2. Based on Permen PUPR 10/2017, TPS which has area of 1000 m2 is capable to serve 200 family with the waste capacity up to 30 m3/day. The purpose of redesign of TPS 3R in Kedurus is to optimize TPS performance. In planning, the service area is reduced to 13,107 people and the waste generation is projected to 32.4 m3/day. Planning of waste handling system in TPS Kedurus is consisted of waste loading, waste sorting, organic waste treatment, inorganic waste treatment, residue treatment, and other facility. Waste sorting is done manually by conveyor belt. Inorganic waste is handled based on its properties. Plastic waste will be shredded, and paper waste will be pressed. On the other hand, glass and metal will be placed in storage area before sale. Organic waste will be treated by open windrow composting. Residue is placed on a container and it will be transported to landfill. Other facilities such as office, worker room, prayer room, toilet, drainage, and parking lot to support the operation of TPS 3R. The operating period of TPS 3 will be held from 2021 until 2030. With this system, waste generation is projected to 11 m3/day by 2030. There is reduction of the waste generation so the volume which is transported to landfill will be decreased. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan |
spellingShingle |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan Ulfah Zatadini, Sharfina REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA |
description |
TPS Kedurus services 8 out of 9 RW in Kelurahan Kedurus with service area is 1 km2 and 21,558 people. Waste generation from the activity is 53,335 m3/day or 2.5 liter/person/day. The planning area for TPS 3R is 1000 m2. Based on Permen PUPR 10/2017, TPS which has area of 1000 m2 is capable to serve 200 family with the waste capacity up to 30 m3/day. The purpose of redesign of TPS 3R in Kedurus is to optimize TPS performance. In planning, the service area is reduced to 13,107 people and the waste generation is projected to 32.4 m3/day. Planning of waste handling system in TPS Kedurus is consisted of waste loading, waste sorting, organic waste treatment, inorganic waste treatment, residue treatment, and other facility. Waste sorting is done manually by conveyor belt. Inorganic waste is handled based on its properties. Plastic waste will be shredded, and paper waste will be pressed. On the other hand, glass and metal will be placed in storage area before sale. Organic waste will be treated by open windrow composting. Residue is placed on a container and it will be transported to landfill. Other facilities such as office, worker room, prayer room, toilet, drainage, and parking lot to support the operation of TPS 3R. The operating period of TPS 3 will be held from 2021 until 2030. With this system, waste generation is projected to 11 m3/day by 2030. There is reduction of the waste generation so the volume which is transported to landfill will be decreased.
|
format |
Final Project |
author |
Ulfah Zatadini, Sharfina |
author_facet |
Ulfah Zatadini, Sharfina |
author_sort |
Ulfah Zatadini, Sharfina |
title |
REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA |
title_short |
REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA |
title_full |
REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA |
title_fullStr |
REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA |
title_full_unstemmed |
REDESIGN OF TPS 3R KEDURUS, KARANG PILANG, SURABAYA |
title_sort |
redesign of tps 3r kedurus, karang pilang, surabaya |
url |
https://digilib.itb.ac.id/gdl/view/39619 |
_version_ |
1822269310261788672 |