OPTIMIZATION OF HYBRID POWER SYSTEM WITH PV PENETRATION : LOW, MEDIUM, AND HIGH FOR SENTANI SUBSTATION AND MERAH SUBSTATION (STUDY CASE JAYAPURA GRID)
The current grid condition in Indonesia, which is highly dependent on thermal generation, produces high carbon emissions that can be harmful to humans and the environment. Much more friendly energy source solutions are already applied in the world. One of solution is hybrid power system. The Hybr...
Saved in:
Main Author: | Soadamara, Alamson |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/39708 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN AND ANALYSIS OF OFF-GRID PV SYSTEM WITH HYBRID ENERGY STORAGE SYSTEM
by: Ihsan, Boy -
OPTIMIZATION OF HYBRID POWER PLANTS WITH PV PENETRATION: LOW, MEDIUM, AND HIGH, IN HOLTEKAMP, WAENA, AND YARMOKH SUBSTATION, STUDY CASE JAYAPURA POWER GRID
by: Pramana Fitrah, Adam -
PERFORMANCE PREDICTION OF RENEWABLE FRACTION FOR SMART ELECTRICITY GRID USING HYBRID MODELLING METHOD
by: Amalia Safira, Nabilah -
PERFORMANCE PREDICTION OF RENEWABLE FRACTION FOR SMART ELECTRICITY GRID USING HYBRID MODELLING METHOD
by: Narendra Purnama Putra, Taufiq -
DESIGN AND TESTING OF THERMOSIPHON-COOLED FLOATING PV SYSTEM
by: Divanto, Ameirza