DESIGN OF NURUL KALAM GRAND MOSQUE PEMALANG IN CONSTRUCTION MANAGEMENT ASPECT

does not yet have sufficient capacity to meet the needs of daily worshipers and on holidays. Therefore, it is necessary to build the Nurul Kalam Grand Mosque so that the mosque can fulfill various community activities, not only worship activities, but also educational, social, economic, and recre...

Full description

Saved in:
Bibliographic Details
Main Author: Prasetia, Rahmandia
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/39792
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:39792
spelling id-itb.:397922019-06-27T15:59:01ZDESIGN OF NURUL KALAM GRAND MOSQUE PEMALANG IN CONSTRUCTION MANAGEMENT ASPECT Prasetia, Rahmandia Indonesia Final Project Nurul Kalam Grand Mosque, construction method, estimated construction costs INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39792 does not yet have sufficient capacity to meet the needs of daily worshipers and on holidays. Therefore, it is necessary to build the Nurul Kalam Grand Mosque so that the mosque can fulfill various community activities, not only worship activities, but also educational, social, economic, and recreational activities. The construction of the Nurul Kalam Grand Mosque on aspects of construction management will be reviewed in this Final Project. The scope of the final assignment includes construction methods, calculation of the volume of material requirements, construction scheduling calculations, and estimated construction costs. Performed calculation of volume requirements using Tekla Structure while work productivity calculations using lead sources method for workers and heavy equipment. Calculation of the construction schedule uses Microsoft Project and the calculation of construction costs refers to SNI and PU Candy No. 28. There are four stages of work consisting of preparatory work, earthworks and foundations, upper structural work and landscape work with a total construction cost of Rp94.384.706.736 and a work period of 583 days. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description does not yet have sufficient capacity to meet the needs of daily worshipers and on holidays. Therefore, it is necessary to build the Nurul Kalam Grand Mosque so that the mosque can fulfill various community activities, not only worship activities, but also educational, social, economic, and recreational activities. The construction of the Nurul Kalam Grand Mosque on aspects of construction management will be reviewed in this Final Project. The scope of the final assignment includes construction methods, calculation of the volume of material requirements, construction scheduling calculations, and estimated construction costs. Performed calculation of volume requirements using Tekla Structure while work productivity calculations using lead sources method for workers and heavy equipment. Calculation of the construction schedule uses Microsoft Project and the calculation of construction costs refers to SNI and PU Candy No. 28. There are four stages of work consisting of preparatory work, earthworks and foundations, upper structural work and landscape work with a total construction cost of Rp94.384.706.736 and a work period of 583 days.
format Final Project
author Prasetia, Rahmandia
spellingShingle Prasetia, Rahmandia
DESIGN OF NURUL KALAM GRAND MOSQUE PEMALANG IN CONSTRUCTION MANAGEMENT ASPECT
author_facet Prasetia, Rahmandia
author_sort Prasetia, Rahmandia
title DESIGN OF NURUL KALAM GRAND MOSQUE PEMALANG IN CONSTRUCTION MANAGEMENT ASPECT
title_short DESIGN OF NURUL KALAM GRAND MOSQUE PEMALANG IN CONSTRUCTION MANAGEMENT ASPECT
title_full DESIGN OF NURUL KALAM GRAND MOSQUE PEMALANG IN CONSTRUCTION MANAGEMENT ASPECT
title_fullStr DESIGN OF NURUL KALAM GRAND MOSQUE PEMALANG IN CONSTRUCTION MANAGEMENT ASPECT
title_full_unstemmed DESIGN OF NURUL KALAM GRAND MOSQUE PEMALANG IN CONSTRUCTION MANAGEMENT ASPECT
title_sort design of nurul kalam grand mosque pemalang in construction management aspect
url https://digilib.itb.ac.id/gdl/view/39792
_version_ 1822925403980824576