PERHITUNGAN RISIKO KERUGIAN EKONOMI AKIBAT BANJIR ROB (TIDAL INUNDATION) DI WILAYAH JAKARTA

Jakarta as a coastal city can experience tidal floods. This phenomena can be worsen by land subsidence. Tidal floods can cause flooding on land and resulted in economic losses and damage to roads, bridges, buildings, and lands. This research was conducted to modeling tidal floods and calculating the...

Full description

Saved in:
Bibliographic Details
Main Author: Oktavia Pramesti, Gayatri
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/39892
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:39892
spelling id-itb.:398922019-06-28T13:17:48ZPERHITUNGAN RISIKO KERUGIAN EKONOMI AKIBAT BANJIR ROB (TIDAL INUNDATION) DI WILAYAH JAKARTA Oktavia Pramesti, Gayatri Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project tidal flood, economic calculation, tidal flood adaptation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/39892 Jakarta as a coastal city can experience tidal floods. This phenomena can be worsen by land subsidence. Tidal floods can cause flooding on land and resulted in economic losses and damage to roads, bridges, buildings, and lands. This research was conducted to modeling tidal floods and calculating the value of economic losses and costs for adaptation to tidal floods. Economic loss calculations are carried out by using tidal flood map data, economic exposure value data for each land use, and vulnerability value of each land use class for certain depth floods. Maps of inundated areas are obtained from overlay between tidal flood map and land use map. The results from this process are tidal flood maps from the year of 2017 and prediction for 2027. Adaptation cost calculation is carried out by overlaying tidal flood, road network, river network data, building data, and land use of Jakarta. From the results of tidal flood modeling, it shows that in 2027 tidal floods area predicted to increase for 3170 ha, from 2017. In addition, the increase in tidal floods area caused an increase in economic losses and flood adaptation costs. In 2027 the estimated value of economic losses is predicted to reach IDR 21 trillion or increases four times from IDR 5 trillion in 2017. In 2027 the estimated value of infrastructure, building adaptation land recovery costs is predicted to reach IDR 40 - 87 trillion or increases more than twice from IDR 16 - 38 trillion in 2017. The estimated cost to build dikes for tidal flood adaptation is IDR 20 trillion and to build giant sea walls as a NCICD program is IDR 400-600 trillion. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Oktavia Pramesti, Gayatri
PERHITUNGAN RISIKO KERUGIAN EKONOMI AKIBAT BANJIR ROB (TIDAL INUNDATION) DI WILAYAH JAKARTA
description Jakarta as a coastal city can experience tidal floods. This phenomena can be worsen by land subsidence. Tidal floods can cause flooding on land and resulted in economic losses and damage to roads, bridges, buildings, and lands. This research was conducted to modeling tidal floods and calculating the value of economic losses and costs for adaptation to tidal floods. Economic loss calculations are carried out by using tidal flood map data, economic exposure value data for each land use, and vulnerability value of each land use class for certain depth floods. Maps of inundated areas are obtained from overlay between tidal flood map and land use map. The results from this process are tidal flood maps from the year of 2017 and prediction for 2027. Adaptation cost calculation is carried out by overlaying tidal flood, road network, river network data, building data, and land use of Jakarta. From the results of tidal flood modeling, it shows that in 2027 tidal floods area predicted to increase for 3170 ha, from 2017. In addition, the increase in tidal floods area caused an increase in economic losses and flood adaptation costs. In 2027 the estimated value of economic losses is predicted to reach IDR 21 trillion or increases four times from IDR 5 trillion in 2017. In 2027 the estimated value of infrastructure, building adaptation land recovery costs is predicted to reach IDR 40 - 87 trillion or increases more than twice from IDR 16 - 38 trillion in 2017. The estimated cost to build dikes for tidal flood adaptation is IDR 20 trillion and to build giant sea walls as a NCICD program is IDR 400-600 trillion.
format Final Project
author Oktavia Pramesti, Gayatri
author_facet Oktavia Pramesti, Gayatri
author_sort Oktavia Pramesti, Gayatri
title PERHITUNGAN RISIKO KERUGIAN EKONOMI AKIBAT BANJIR ROB (TIDAL INUNDATION) DI WILAYAH JAKARTA
title_short PERHITUNGAN RISIKO KERUGIAN EKONOMI AKIBAT BANJIR ROB (TIDAL INUNDATION) DI WILAYAH JAKARTA
title_full PERHITUNGAN RISIKO KERUGIAN EKONOMI AKIBAT BANJIR ROB (TIDAL INUNDATION) DI WILAYAH JAKARTA
title_fullStr PERHITUNGAN RISIKO KERUGIAN EKONOMI AKIBAT BANJIR ROB (TIDAL INUNDATION) DI WILAYAH JAKARTA
title_full_unstemmed PERHITUNGAN RISIKO KERUGIAN EKONOMI AKIBAT BANJIR ROB (TIDAL INUNDATION) DI WILAYAH JAKARTA
title_sort perhitungan risiko kerugian ekonomi akibat banjir rob (tidal inundation) di wilayah jakarta
url https://digilib.itb.ac.id/gdl/view/39892
_version_ 1822925463376363520