SOFTWARE DESIGN AND IMPLEMENTATION OF WASTE MANAGEMENT SYSTEM ON PUBLIC FACILITIES (CASE STUDIES: INSTITUT TEKNOLOGI BANDUNG)
One of the consequences of population growth is the increasing amount of waste produced. This could lead to many problems if the management of waste is not done effectively. Waste management process includes trash collection on trash bins, trash distribution, and trash dumping on the landfills. The...
Saved in:
Main Author: | Andita Resapati, Fathia |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/39989 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
HARDWARE DESIGN AND IMPLEMENTATION OF THE WASTE MANAGEMENT SYSTEM ON PUBLIC FACILITIES (STUDY CASE: BANDUNG INSTITUTE OF TECHNOLOGY)
by: Nur Hidayati, Airinnisa -
SCHEDULING DESIGN OF CONSTRUCTION PROJECT CENTER FOR ADVANCED SCIENCES (CAS) INSTITUT TEKNOLOGI BANDUNG
by: ANDITA SETYA PERMATASARI , CICILIA -
DESIGNING PUBLIC FACILITY TO FORM HABIT OF DISPOSING AND SORTING WASTE FOR PUBLIC SPACES IN BANDUNG
by: Ida Andrianto, Erina -
PROPOSAL OF KNOWLEDGE MANAGEMENT IMPLEMENTATION TO PERFORMANCE MANAGEMENT FOR FACULTY MEMBER OF SCHOOL OF BUSINESS AND MANAGEMENT-INSTITUT TEKNOLOGI BANDUNG (SBMITB)
by: FAJAR PUTRANTO (NIM : 29108339); Pembimbing: Prof.Dr.Ir. Jann H. Tjakraatmadja, MSIE, BIJAK -
STUDY OF PUBLIC POLICY IMPLEMENTATION IN DRAINAGE MANAGEMENT AT BANDUNG INSTITUTE OF TECHNOLOGY GANESHA CAMPUS
by: ALEXANDER , EDWIN