DEVELOPING A PREDICTIVE MODEL OF CO2 FLOODING PROJECT
Economic analysis that perceive both technical and economical parameters plays crucial role in identifying the feasibility of EOR application. This step usually be done before further reservoir investigation being conducted. A model that can fulfill the analysis will greatly help the project feasibi...
Saved in:
Main Author: | Marusaha Matthew Pandi, D'Aqnan |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40060 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PREDICTIVE MODEL GENERATION FOR CO2-N2 FLOODING PROJECT
by: Akbar Habibie, Ilham -
DEVELOPING A PREDICTIVE PROXY MODEL OF ENHANCED COAL BED METHANE CO2 INJECTION (CO2-ECBM) PROJECT
by: Iqbal, Mohammad -
DEVELOPING A PREDICTIVE PROXY MODEL OF ENHANCED COAL BED METHANE CO2 INJECTION (CO2-ECBM) PROJECT
by: Iqbal, Mohammad -
UTILIZING MACHINE LEARNING FOR WELL SPACING OPTIMIZATION ON CO2 FLOODING PROJECT
by: Riyanto, Theodorus -
PERFORMANCE PREDICTION GUIDELINE FOR CO2 FLOODING IN INDONESIA USING EMPIRICAL EQUATION
by: Caesar Ramadhan, Fajar