EQUALIZED METHOD: A NEW METHOD TO OPTIMIZE GAS LIFT SPACING DESIGN
In gas lift valve spacing design, there is a common misconception where killing fluid is represented as static no matter the state of the well’s depletion. Killing fluid level, however, changes over time due to fluid infiltration into the reservoir. An innovative method is proposed to optimize gas l...
Saved in:
Main Author: | Perwira Indro, Axel |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40129 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GAS LIFT SPACING DESIGN METHOD FOR UNCONVENTIONAL RESERVOIR WELL
by: Indira Puspita Sari, Maria -
PRODUCTION PERFORMANCE OPTIMIZATION USING EQUAL SLOPE METHOD IN FIELD X WITH HYBRID ARTIFICIAL LIFT: ELECTRICAL SUBMERSIBLE PUMP AND GAS LIFT
by: Morteza Imaduddin, Ali -
THE USE OF THE EQUAL SLOPE METHOD IN OPTIMIZATION OF ARTIFICIAL LIFT IN FIELD K WITH TWO TYPES OF ARTIFICIAL LIFT
by: Lourenco Soares Ama, Florentino -
Gas Lift Optimization using Numerical Method
by: BRAMANA (NIM 12205030); Pembimbing: Dr. Ir. Pudjo Sukarno, SATRIA -
EVALUATION OF EQUAL SLOPE METHOD FOR OPTIMIZING THE PRODUCTION IN A FIELD WITH MORE THAN ONE ARTIFICIAL LIFT
by: Allan Nurin, Muhammad