TRANSPORTATION DESIGN OF ART AND CULTURE CENTER BUILDING OF BANDUNG
Art and Culture Center Building of Bandung consists of two buildings, each of which has five floors (two floors form a basement) and central park with skywalk. Each building has a planned theater can accommodate 1000 and 500 spectators. On one of the building there is also an amphitheater for per...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/40178 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:40178 |
---|---|
spelling |
id-itb.:401782019-07-01T10:57:52ZTRANSPORTATION DESIGN OF ART AND CULTURE CENTER BUILDING OF BANDUNG Thirafi, Muhammad Teknik sipil Indonesia Final Project transportation system, parking, pavement design, queue INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/40178 Art and Culture Center Building of Bandung consists of two buildings, each of which has five floors (two floors form a basement) and central park with skywalk. Each building has a planned theater can accommodate 1000 and 500 spectators. On one of the building there is also an amphitheater for performances which are parade along the skywalk. On one of the building there is also an amphitheater for performances which are parade along the skywalk. The building is planned to be built at the junction between Jl. Laswi and Jl. Sukabumi. With the construction of this building, then planning against the transport system needs to be done. In the process of designing, the main thing to do is an analysis of the number of vehicles that will come, whether it be parked or not. In analyzing the number of vehicles that will be parked, the parking needs analysis unit of parking spaces in the building has a typical function reference and attendance. Then designed the pattern produces 118 parking slot parking lot and 150 motor parking slot. After the designed parking then designing pavement on access roads. Designing pavement will makes 2 pavement design, design of flexible pavement and design of rigid pavement. The two are then compared through the lifecycle cost analysis. Selected pavement is rigid pavement that produce smaller cost based on lifecycle cost analysis with total thickness of pavement is 345 mm. After that, designing circulation of vehicles on the access roads and basement design including number of counters required parking. The number of counters used in the parking lot entrance are 2 counters for car and truck, and 1 for motorcyle which produces the average length of a queue is 0,018 car and 0,024 motorcycle. The number of counters used in the parking lot entrance are 2 counters for car, 1 for motorcyle and 1 for truck which produces the average length of a queue are 0,05 car and 0,209 motorcycle. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik sipil |
spellingShingle |
Teknik sipil Thirafi, Muhammad TRANSPORTATION DESIGN OF ART AND CULTURE CENTER BUILDING OF BANDUNG |
description |
Art and Culture Center Building of Bandung consists of two buildings, each of
which has five floors (two floors form a basement) and central park with skywalk.
Each building has a planned theater can accommodate 1000 and 500 spectators.
On one of the building there is also an amphitheater for performances which are
parade along the skywalk. On one of the building there is also an amphitheater for
performances which are parade along the skywalk. The building is planned to be
built at the junction between Jl. Laswi and Jl. Sukabumi. With the construction of
this building, then planning against the transport system needs to be done. In the
process of designing, the main thing to do is an analysis of the number of vehicles
that will come, whether it be parked or not. In analyzing the number of vehicles that
will be parked, the parking needs analysis unit of parking spaces in the building
has a typical function reference and attendance. Then designed the pattern
produces 118 parking slot parking lot and 150 motor parking slot. After the
designed parking then designing pavement on access roads. Designing pavement
will makes 2 pavement design, design of flexible pavement and design of rigid
pavement. The two are then compared through the lifecycle cost analysis. Selected
pavement is rigid pavement that produce smaller cost based on lifecycle cost
analysis with total thickness of pavement is 345 mm. After that, designing
circulation of vehicles on the access roads and basement design including number
of counters required parking. The number of counters used in the parking lot
entrance are 2 counters for car and truck, and 1 for motorcyle which produces the
average length of a queue is 0,018 car and 0,024 motorcycle. The number of
counters used in the parking lot entrance are 2 counters for car, 1 for motorcyle
and 1 for truck which produces the average length of a queue are 0,05 car and
0,209 motorcycle. |
format |
Final Project |
author |
Thirafi, Muhammad |
author_facet |
Thirafi, Muhammad |
author_sort |
Thirafi, Muhammad |
title |
TRANSPORTATION DESIGN OF ART AND CULTURE CENTER BUILDING OF BANDUNG |
title_short |
TRANSPORTATION DESIGN OF ART AND CULTURE CENTER BUILDING OF BANDUNG |
title_full |
TRANSPORTATION DESIGN OF ART AND CULTURE CENTER BUILDING OF BANDUNG |
title_fullStr |
TRANSPORTATION DESIGN OF ART AND CULTURE CENTER BUILDING OF BANDUNG |
title_full_unstemmed |
TRANSPORTATION DESIGN OF ART AND CULTURE CENTER BUILDING OF BANDUNG |
title_sort |
transportation design of art and culture center building of bandung |
url |
https://digilib.itb.ac.id/gdl/view/40178 |
_version_ |
1822269484598034432 |