"PERANCANGAN SALURAN DRAINASE DAN SISTEM SURYA ROTUA VERONIKA SIANIPAR PROGRAM STUDI TEKNIK SIPIL DEWATERING PADA PUSAT PERBELANJAAN DI JALAN JENDERAL SUDIRMAN PALEMBANG" DAN "PERANCANGAN METODE PELAKSANAAN, PENJADWALAN, DAN ESTIMASI BIAYA KONSTRUKSI PUSAT PERBELANJAAN BERBASIS GAYA HIDUP DI PALEMBANG"

ABSTRACT 1: The city of Palembang is the second-largest city on the island of Sumatra as well as the capital of South Sumatra Province is currently experiencing rapid development. To meet the consumption, socialization, and recreational needs of the people in Palembang City, infrastructure developm...

Full description

Saved in:
Bibliographic Details
Main Author: Rotua Veronika Sianipar, Surya
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/40204
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:40204
spelling id-itb.:402042019-07-01T11:30:33Z"PERANCANGAN SALURAN DRAINASE DAN SISTEM SURYA ROTUA VERONIKA SIANIPAR PROGRAM STUDI TEKNIK SIPIL DEWATERING PADA PUSAT PERBELANJAAN DI JALAN JENDERAL SUDIRMAN PALEMBANG" DAN "PERANCANGAN METODE PELAKSANAAN, PENJADWALAN, DAN ESTIMASI BIAYA KONSTRUKSI PUSAT PERBELANJAAN BERBASIS GAYA HIDUP DI PALEMBANG" Rotua Veronika Sianipar, Surya Teknik sipil Indonesia Final Project Maximum daily rainfall, Drainage Channels, Dewatering, WellPoint; Construction Implementation Method, Productivity, Lead Resource, Unit Price, Resource Enumeration. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/40204 ABSTRACT 1: The city of Palembang is the second-largest city on the island of Sumatra as well as the capital of South Sumatra Province is currently experiencing rapid development. To meet the consumption, socialization, and recreational needs of the people in Palembang City, infrastructure development in the form of today's shopping centers is needed. one of which is the Lifestyle Based Shopping Center. The scope of this final project generally includes the planning of building drainage and dewatering for the construction of this shopping center. The determination of the dimensions of the drainage channel is based on daily maximum rainfall with an appropriate and harmonized distribution method. With this dimension, it is expected to be able to provide the capacity that can withstand flood discharge in this building. In addition, the implementation of dewatering is carried out to make groundwater so that the construction work is not disturbed by the presence of groundwater level. This is done by planning the appropriate pump based on the well point method. ABSTRACT 2: The city of Palembang is the second-largest city on the island of Sumatra and the capital of South Sumatra Province is currently developing fast enough. To meet the consumption, socialization, and recreation needs of the people in Palembang City, development is needed, one of which is the Lifestyle-Based Shopping Center. The planning space of this final project discusses the planning of implementation methods, scheduling, and estimation of construction costs for the construction of this expenditure center. The determination of the duration of work is based on two factors, namely based on the productivity of heavy equipments and the main resources of the workforce. Details of detailed costs are carried out using two methods, namely unit price using SNI or PU and calculation of resources. The project is implemented from 1 July 2019 to 26 July 2021 with a total duration of 518 days. Preparatory work was carried out for 54 days, earthworks were carried out for 36 days, lower structure works for 157 days, and top structural work for 346 days. The implementation budget / direct costs plan is Rp. 116,336,028,758,- and the Project Budget Plan is Rp. 146,882,213,287,- with a percentage of costs, namely 6.27% for preparation work, 3.79% for earthworks, 0.387% for water resources design, 28.23% for lower structure work, and 61.32% for upper structure work. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik sipil
spellingShingle Teknik sipil
Rotua Veronika Sianipar, Surya
"PERANCANGAN SALURAN DRAINASE DAN SISTEM SURYA ROTUA VERONIKA SIANIPAR PROGRAM STUDI TEKNIK SIPIL DEWATERING PADA PUSAT PERBELANJAAN DI JALAN JENDERAL SUDIRMAN PALEMBANG" DAN "PERANCANGAN METODE PELAKSANAAN, PENJADWALAN, DAN ESTIMASI BIAYA KONSTRUKSI PUSAT PERBELANJAAN BERBASIS GAYA HIDUP DI PALEMBANG"
description ABSTRACT 1: The city of Palembang is the second-largest city on the island of Sumatra as well as the capital of South Sumatra Province is currently experiencing rapid development. To meet the consumption, socialization, and recreational needs of the people in Palembang City, infrastructure development in the form of today's shopping centers is needed. one of which is the Lifestyle Based Shopping Center. The scope of this final project generally includes the planning of building drainage and dewatering for the construction of this shopping center. The determination of the dimensions of the drainage channel is based on daily maximum rainfall with an appropriate and harmonized distribution method. With this dimension, it is expected to be able to provide the capacity that can withstand flood discharge in this building. In addition, the implementation of dewatering is carried out to make groundwater so that the construction work is not disturbed by the presence of groundwater level. This is done by planning the appropriate pump based on the well point method. ABSTRACT 2: The city of Palembang is the second-largest city on the island of Sumatra and the capital of South Sumatra Province is currently developing fast enough. To meet the consumption, socialization, and recreation needs of the people in Palembang City, development is needed, one of which is the Lifestyle-Based Shopping Center. The planning space of this final project discusses the planning of implementation methods, scheduling, and estimation of construction costs for the construction of this expenditure center. The determination of the duration of work is based on two factors, namely based on the productivity of heavy equipments and the main resources of the workforce. Details of detailed costs are carried out using two methods, namely unit price using SNI or PU and calculation of resources. The project is implemented from 1 July 2019 to 26 July 2021 with a total duration of 518 days. Preparatory work was carried out for 54 days, earthworks were carried out for 36 days, lower structure works for 157 days, and top structural work for 346 days. The implementation budget / direct costs plan is Rp. 116,336,028,758,- and the Project Budget Plan is Rp. 146,882,213,287,- with a percentage of costs, namely 6.27% for preparation work, 3.79% for earthworks, 0.387% for water resources design, 28.23% for lower structure work, and 61.32% for upper structure work.
format Final Project
author Rotua Veronika Sianipar, Surya
author_facet Rotua Veronika Sianipar, Surya
author_sort Rotua Veronika Sianipar, Surya
title "PERANCANGAN SALURAN DRAINASE DAN SISTEM SURYA ROTUA VERONIKA SIANIPAR PROGRAM STUDI TEKNIK SIPIL DEWATERING PADA PUSAT PERBELANJAAN DI JALAN JENDERAL SUDIRMAN PALEMBANG" DAN "PERANCANGAN METODE PELAKSANAAN, PENJADWALAN, DAN ESTIMASI BIAYA KONSTRUKSI PUSAT PERBELANJAAN BERBASIS GAYA HIDUP DI PALEMBANG"
title_short "PERANCANGAN SALURAN DRAINASE DAN SISTEM SURYA ROTUA VERONIKA SIANIPAR PROGRAM STUDI TEKNIK SIPIL DEWATERING PADA PUSAT PERBELANJAAN DI JALAN JENDERAL SUDIRMAN PALEMBANG" DAN "PERANCANGAN METODE PELAKSANAAN, PENJADWALAN, DAN ESTIMASI BIAYA KONSTRUKSI PUSAT PERBELANJAAN BERBASIS GAYA HIDUP DI PALEMBANG"
title_full "PERANCANGAN SALURAN DRAINASE DAN SISTEM SURYA ROTUA VERONIKA SIANIPAR PROGRAM STUDI TEKNIK SIPIL DEWATERING PADA PUSAT PERBELANJAAN DI JALAN JENDERAL SUDIRMAN PALEMBANG" DAN "PERANCANGAN METODE PELAKSANAAN, PENJADWALAN, DAN ESTIMASI BIAYA KONSTRUKSI PUSAT PERBELANJAAN BERBASIS GAYA HIDUP DI PALEMBANG"
title_fullStr "PERANCANGAN SALURAN DRAINASE DAN SISTEM SURYA ROTUA VERONIKA SIANIPAR PROGRAM STUDI TEKNIK SIPIL DEWATERING PADA PUSAT PERBELANJAAN DI JALAN JENDERAL SUDIRMAN PALEMBANG" DAN "PERANCANGAN METODE PELAKSANAAN, PENJADWALAN, DAN ESTIMASI BIAYA KONSTRUKSI PUSAT PERBELANJAAN BERBASIS GAYA HIDUP DI PALEMBANG"
title_full_unstemmed "PERANCANGAN SALURAN DRAINASE DAN SISTEM SURYA ROTUA VERONIKA SIANIPAR PROGRAM STUDI TEKNIK SIPIL DEWATERING PADA PUSAT PERBELANJAAN DI JALAN JENDERAL SUDIRMAN PALEMBANG" DAN "PERANCANGAN METODE PELAKSANAAN, PENJADWALAN, DAN ESTIMASI BIAYA KONSTRUKSI PUSAT PERBELANJAAN BERBASIS GAYA HIDUP DI PALEMBANG"
title_sort "perancangan saluran drainase dan sistem surya rotua veronika sianipar program studi teknik sipil dewatering pada pusat perbelanjaan di jalan jenderal sudirman palembang" dan "perancangan metode pelaksanaan, penjadwalan, dan estimasi biaya konstruksi pusat perbelanjaan berbasis gaya hidup di palembang"
url https://digilib.itb.ac.id/gdl/view/40204
_version_ 1821998019704258560