Evaluation of Tube Plugging on Compressed Natural Gas Aftercooler and Assessment of Tube-lining Methode

A heat exchanger has been evaluated of its remaining years of operation in this thesis. On August 2012, a fin fan exchanger that has been operational on an offshore gas production site for 33 years, is brought to stop temporarily because tubes were leaking. This heat exchanger has an outside dimensi...

Full description

Saved in:
Bibliographic Details
Main Author: Wardhana Bachtiar, Randi
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/40600
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia