ANALISIS TERMAL SIKLUS RANKINE ORGANIK PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI
Indonesia has the potential geothermal power of 28,170 MW or about 40% of world’s geothermal potency. Until 2009, only 1,189 MW were installed all over the country. The government has projected by 2025, there are 9,466 MW new power plant mounted through all over the country. This final project r...