CFD Study on The Effort of Lowering Construction Height of The Upper Part Cement Preheater

Suspension Preheater is a part of cement plant equipment to enhance kiln feed temperature up to 800-9000C with 80-90% calcination degree. The problem occured on the suspension preheater design is the high elevation of cantilever construction needed to support overall structure. Suspension preheat...

Full description

Saved in:
Bibliographic Details
Main Author: Gusti Putu Firman Hadi, I
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/40779
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items