Failure Analysis of Gas Turbine Generator (GTG) 14.25 MW Case Study: GTG Kujang 1Bâs Failure at January 19th 2013.
Gas Turbines which is used in industries, especially for power generating, must be working optimal and efficient as high as possible. Therefore, the reability and availability of the gas turbine shall have a high value. In the end of 2009, GTG Kujang 1B had a catastrophic failure due to first sta...
Saved in:
Main Author: | Fendy Pratama, Arfianto |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/40795 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
FAILURE ANALYSIS OF GAS TURBINE GENERATOR (GTG) 14,25 MW
by: YONGKI WIJAYA (NIM : 13107124); Pembimbing Utama : Dr. -Ing. Tri Yuswidjajanto Zaenuri; Pe, ANTONIUS -
ANALISIS KEGAGALAN GAS TURBINE GENERATOR (GTG) 14,25 MW.
by: Yongki Wijaya, Antonius -
Karyotype and idiogram of the axis deer (Axia axis, Cervidae) by conventional staining, GTG-, high-resolution GTG-, and Ag-NOR-banding techniques
by: Hathaipat Khongcharoensuk, et al.
Published: (2018) -
Karyotype and idiogram of the axis deer (Axia axis, Cervidae) by conventional staining, GTG-, high-resolution GTG-, and Ag-NOR-banding techniques
by: Hathaipat Khongcharoensuk, et al.
Published: (2018) -
Karyotype and idiogram of the axis deer (Axia axis, Cervidae) by conventional staining, GTG-, high-resolution GTG-, and Ag-NOR-banding techniques
by: Khongcharoensuk H., et al.
Published: (2017)