REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA

Indonesia, as the aircraft industry of PT. Dirgantara Indonesia in addition to being demanded to produce good quality products, on time delivery to customers is one of the factors affecting customer satisfaction and which can greatly increase the value of the company own. One of the most influent...

Full description

Saved in:
Bibliographic Details
Main Author: Panca Rinaldi, Teguh
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/41227
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:41227
spelling id-itb.:412272019-07-31T14:44:32ZREDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA Panca Rinaldi, Teguh Manajemen umum Indonesia Theses Purchase Requisition, Non Aircraft Material, Delayed, Material Planning, Procurement, MRP, VMI INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/41227 Indonesia, as the aircraft industry of PT. Dirgantara Indonesia in addition to being demanded to produce good quality products, on time delivery to customers is one of the factors affecting customer satisfaction and which can greatly increase the value of the company own. One of the most influential factors in timely delivery is the availability of materials, production will run smoothly when the required material is always available. The availability of the material in question is not only the Aircraft (Aircraft Material) but there is also material to support the production (Non Aircraft Material) such as production support equipment. For material supply control and other processes PT. Dirgantara Indonesia is already using SAP in running it. However only Aircraft material can be controlled by the system’s material inventory, but for Non Aircraft material we can not control the material inventory. In the production of the aircraft is of course through a long production process, and to support the production process required materials and production aids (Non Aircraft Materials). The problem faced by one is the acceleration of the arrival of goods is not proportional to the demand, where there is often delay in the arrival of goods that may cause inhibition of production process, thus impacting the next production process that will cause delays in delivery to the customer. Alternative solutions are proposed to reduce PR delayed non aircraft materials, there some alternative solutions, Develop the Material Requirement Planning (MRP) system and Vendor Managed Inventory (VMI). But to achive that four strategic plan are needed suc as, Invite Suplier, Select Suplier, Create contract and Implementation contract. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Panca Rinaldi, Teguh
REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA
description Indonesia, as the aircraft industry of PT. Dirgantara Indonesia in addition to being demanded to produce good quality products, on time delivery to customers is one of the factors affecting customer satisfaction and which can greatly increase the value of the company own. One of the most influential factors in timely delivery is the availability of materials, production will run smoothly when the required material is always available. The availability of the material in question is not only the Aircraft (Aircraft Material) but there is also material to support the production (Non Aircraft Material) such as production support equipment. For material supply control and other processes PT. Dirgantara Indonesia is already using SAP in running it. However only Aircraft material can be controlled by the system’s material inventory, but for Non Aircraft material we can not control the material inventory. In the production of the aircraft is of course through a long production process, and to support the production process required materials and production aids (Non Aircraft Materials). The problem faced by one is the acceleration of the arrival of goods is not proportional to the demand, where there is often delay in the arrival of goods that may cause inhibition of production process, thus impacting the next production process that will cause delays in delivery to the customer. Alternative solutions are proposed to reduce PR delayed non aircraft materials, there some alternative solutions, Develop the Material Requirement Planning (MRP) system and Vendor Managed Inventory (VMI). But to achive that four strategic plan are needed suc as, Invite Suplier, Select Suplier, Create contract and Implementation contract.
format Theses
author Panca Rinaldi, Teguh
author_facet Panca Rinaldi, Teguh
author_sort Panca Rinaldi, Teguh
title REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA
title_short REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA
title_full REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA
title_fullStr REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA
title_full_unstemmed REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA
title_sort reducing purchase requisition non aircraft material delayed at procurement and logistic division pt. dirgantara indonesia
url https://digilib.itb.ac.id/gdl/view/41227
_version_ 1822925935261777920