REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA
Indonesia, as the aircraft industry of PT. Dirgantara Indonesia in addition to being demanded to produce good quality products, on time delivery to customers is one of the factors affecting customer satisfaction and which can greatly increase the value of the company own. One of the most influent...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/41227 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:41227 |
---|---|
spelling |
id-itb.:412272019-07-31T14:44:32ZREDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA Panca Rinaldi, Teguh Manajemen umum Indonesia Theses Purchase Requisition, Non Aircraft Material, Delayed, Material Planning, Procurement, MRP, VMI INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/41227 Indonesia, as the aircraft industry of PT. Dirgantara Indonesia in addition to being demanded to produce good quality products, on time delivery to customers is one of the factors affecting customer satisfaction and which can greatly increase the value of the company own. One of the most influential factors in timely delivery is the availability of materials, production will run smoothly when the required material is always available. The availability of the material in question is not only the Aircraft (Aircraft Material) but there is also material to support the production (Non Aircraft Material) such as production support equipment. For material supply control and other processes PT. Dirgantara Indonesia is already using SAP in running it. However only Aircraft material can be controlled by the system’s material inventory, but for Non Aircraft material we can not control the material inventory. In the production of the aircraft is of course through a long production process, and to support the production process required materials and production aids (Non Aircraft Materials). The problem faced by one is the acceleration of the arrival of goods is not proportional to the demand, where there is often delay in the arrival of goods that may cause inhibition of production process, thus impacting the next production process that will cause delays in delivery to the customer. Alternative solutions are proposed to reduce PR delayed non aircraft materials, there some alternative solutions, Develop the Material Requirement Planning (MRP) system and Vendor Managed Inventory (VMI). But to achive that four strategic plan are needed suc as, Invite Suplier, Select Suplier, Create contract and Implementation contract. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Panca Rinaldi, Teguh REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA |
description |
Indonesia, as the aircraft industry of PT. Dirgantara Indonesia in addition to being
demanded to produce good quality products, on time delivery to customers is one of
the factors affecting customer satisfaction and which can greatly increase the value
of the company own. One of the most influential factors in timely delivery is the
availability of materials, production will run smoothly when the required material is
always available. The availability of the material in question is not only the Aircraft
(Aircraft Material) but there is also material to support the production (Non Aircraft
Material) such as production support equipment. For material supply control and
other processes PT. Dirgantara Indonesia is already using SAP in running it.
However only Aircraft material can be controlled by the system’s material inventory,
but for Non Aircraft material we can not control the material inventory. In the
production of the aircraft is of course through a long production process, and to
support the production process required materials and production aids (Non Aircraft
Materials). The problem faced by one is the acceleration of the arrival of goods is
not proportional to the demand, where there is often delay in the arrival of goods
that may cause inhibition of production process, thus impacting the next production
process that will cause delays in delivery to the customer. Alternative solutions are
proposed to reduce PR delayed non aircraft materials, there some alternative
solutions, Develop the Material Requirement Planning (MRP) system and Vendor
Managed Inventory (VMI). But to achive that four strategic plan are needed suc as,
Invite Suplier, Select Suplier, Create contract and Implementation contract. |
format |
Theses |
author |
Panca Rinaldi, Teguh |
author_facet |
Panca Rinaldi, Teguh |
author_sort |
Panca Rinaldi, Teguh |
title |
REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA |
title_short |
REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA |
title_full |
REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA |
title_fullStr |
REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA |
title_full_unstemmed |
REDUCING PURCHASE REQUISITION NON AIRCRAFT MATERIAL DELAYED AT PROCUREMENT AND LOGISTIC DIVISION PT. DIRGANTARA INDONESIA |
title_sort |
reducing purchase requisition non aircraft material delayed at procurement and logistic division pt. dirgantara indonesia |
url |
https://digilib.itb.ac.id/gdl/view/41227 |
_version_ |
1822925935261777920 |