CONSTRUCTION METHOD OF PASSENGER TERMINAL AND TRAIN STATION STRUCTURE OF ADI SOEMARMO INTERNATIONAL AIRPORT

Adi Soemarmo Airport terminal and train station is constructed to accomodate the demand of passengers’ movement in Boyolali City and the area around it. The passenger terminal consists of two levels and its area is about 19.200 m2 wide. Meanwhile, the train station consists of three levels and its a...

Full description

Saved in:
Bibliographic Details
Main Author: Putri Rahmadhanti, Brigita
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/41526
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Adi Soemarmo Airport terminal and train station is constructed to accomodate the demand of passengers’ movement in Boyolali City and the area around it. The passenger terminal consists of two levels and its area is about 19.200 m2 wide. Meanwhile, the train station consists of three levels and its area is about 2.912 m2 wide. In order to realize the project, there must be a planning method of construction. The planning involves determining effective construction methods, project sheduling, and project estimation The construction method is planned by dividing the project into several work packages. This packages concsist of preparatory works, passanger airport’s structural works, trains station’s structural works, and drainage system. Based on project scheduling planning, the total duration of the construction project is 327 days. The calculation of duration is based on two types of work, which are the work with the lead resource of heavy equipment and work with the lead resource of labors. Apart from duration, the critical path such as preparatory works, passanger airport’s structural works, trains station’s structural works must be anticipated to prevent project delays. For the project cost estimation, it is conducted using analysis of unit prices in accordance with SNI 2008 on Unit Pricing Analysis for Building Construction. The estimated cost of the construction project is Rp 167.573.876.494 which already includes the direct and indirect costs of the project.